Installing The Unit; General Requirements For Installation; Attaching The Unit To The Wall - Ingeteam INGECON SUN STORAGE 1Play 3 Installation And Operation Manual

Single-phase battery inverter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 55

Installing the unit

7. Installing the unit
Before installing the unit, the packaging must be removed, taking special care not to damage the housing.
Check that there is no condensation inside the packaging. If there are signs of condensation, the unit must not be
installed until you are sure it is completely dry.
All installation operations must comply with current regulations.
All operations involving moving heavy weights must be carried out by two people.

7.1. General requirements for installation

The environment of the unit must be appropriate and meet the guidelines described in Chapter "6.
Preparation for installing the unit". Additionally, the parts used in the rest of the installation must be
compatible with the unit and comply with the applicable legislation.
The ventilation and workspace must be suitable for maintenance tasks according to the applicable
regulations in force.
The external connection devices, which must be suitable and sufficiently close as set forth in current
regulations.
The feed cables must be of the appropriate gauge for the maximum current.
Special care must be taken to ensure that there are no external elements near the air inlets and outlets
that obstruct proper cooling of the unit.

7.2. Attaching the unit to the wall

INGECON SUN STORAGE 1Play units have a system for securing them to the wall using a plate. The steps for
fixing the unit properly are as follows. The weight of the unit and the transformer, if fitted, must be taken into
account.
Units without a transformer (TL)
1.
Mark the fixing points for the plates on the wall and drill holes with a suitable bit for the screws to be
used to secure the plate to the wall later.
2.
Fix the plate using stainless steel fittings to prevent corrosion. Suspend the unit from the plate by fitting
the two slats in the openings on the back of the unit.
ABH2013IQM01_A - Installation and Operation Manual
Ingeteam
DE
EN
ES
FR
IT
PT
71

Advertisement

Table of Contents
loading

Table of Contents