Ingeteam INGECON SUN STORAGE 1Play 3 Installation And Operation Manual page 73

Single-phase battery inverter
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 55
Installing the unit
4.
Mark the bottom fixing point, remove the transformer and drill the bottom fixing hole. Fit the transformer
again and screw it in.
5.
Check that the transformer is properly secured.
6.
Suspend the inverter on the transformer by fitting the holes in the former onto the lugs at the top of the
transformer.
7.
Adjust the two housings to line up the two bottom fixings.
8.
Join the inverter and the transformer with the bolt, washers and nut provided.
9.
Check that the unit properly secured.
ABH2013IQM01_A - Installation and Operation Manual
Ingeteam
DE
EN
ES
FR
IT
PT
73

Advertisement

Table of Contents
loading

Table of Contents