Display control
Manual equalization
This enables a manual equalization of the storage system to be carried out.
Start/Stop battery
>
Start or stop the storage system manager. The
symbol points to the option selected. To select the desired option
and configure it, press
on the option once it is highlighted.
The unit will be ready to work with the storage system manager if the START option has been configured.
Send CAN Commands
Send commands to the storage system manager via the CAN communication.
Test fans
Test the unit's fans. The test will last approximately 15 seconds. After this time, the test will automatically
deactivate.