Elevated Operating Ambient Temperature: If the server is installed in a closed or
Caution -
multi-unit rack assembly, the operating ambient temperature of the rack environment might be
greater than room ambient temperature. Therefore, install the equipment only in an environment
compatible with the maximum ambient temperature (Tma) specified for the server.
Reduced Air Flow: Install the equipment in a rack so that the amount of air flow is
Caution -
adequate for the safe operation of the equipment.
Mechanical Loading: Mount the equipment in the rack so that the weight is
Caution -
distributed evenly. A hazardous condition can exist with uneven mechanical loading.
Circuit Overloading: Do not overload the power supply circuits. Before connecting
Caution -
the server to the supply circuit, review the equipment nameplate power ratings and consider the
effect that circuit overloading might have on overcurrent protection and supply wiring.
Reliable Grounding: Maintain reliable grounding of rackmounted equipment. Give
Caution -
particular attention to supply connections other than direct connections to the branch circuit (for
example, use of power strips).
Do not use slide rail mounted equipment as a shelf or a work space.
Caution -
Do not attempt to move the server alone without a lift. For a one-person installation,
Caution -
all the components must be removed, and a lift must be used. For a two-person installation, all
the components must be removed, and a lift is optional.
Due to the weight of the server, the server should not be shipped while it is in a rack
Caution -
unless the shipping braces are installed. Install the server into the rack only at its final location.
Related Information
"Physical Specifications" on page 17
"Handling Precautions" on page 25
"Stabilize the Rack" on page 32
Rack Cautions
Installing the Server
31