Understanding the Server
These topics list the installation tasks, provide an overview of the SPARC T7-4 server, and
highlight the key components.
"Installation Task Overview" on page 11
■
"Server Overview" on page 12
■
"Front Panel Components" on page 14
■
"Rear Panel Components" on page 15
■
Related Information
"Installing the Server" on page 29
■
"Connecting Cables" on page 51
■
"Powering On the Server for the First Time" on page 65
■
Installation Task Overview
Perform these tasks to install and configure the server.
Step
Description
1.
Review the SPARC T7-4 Server Product Notes for any late-
breaking news about the server.
2.
Review the server features, specifications, and site requirements.
3.
Confirm that you received all of the items you ordered.
4.
Learn the server features, controls, and LEDs required for
installation.
5.
Take safety and ESD precautions and assemble the required
tools.
Links
SPARC T7-4 Server Product Notes
"Server Overview" on page 12
"Confirming Specifications" on page 17
"Shipping Kit" on page 23
"Front Panel Components" on page 14
"Rear Panel Components" on page 15
"Handling Precautions" on page 25
Understanding the Server
11
Need help?
Do you have a question about the SPARC T7-4 and is the answer not in the manual?
Questions and answers