Preparing for Installation
3UHSDULQJIRU,QVWDOODWLRQ
AFP-300/AFP-400 Installation PN 50253:C1 05/22/97
www.PDF-Zoo.com
,QVWDOODWLRQ
Unpack the system as follows:
8QSDFNLQJ WKH 6\VWHP
Step
Action
1
Carefully unpack the system and inspect for shipping damage.
2
Select a location for the control panel in a clean, dry, vibration-free area with
moderate temperature.
%HIRUH LQVWDOOLQJ WKH ILUH DODUP V\VWHP UHDG WKH IROORZLQJ
•
Install the system in a readily accessible area with sufficient room to easily install
and maintain the control panel.
•
Locate the top of the cabinet approximately 60 inches above the floor with the
hinge mounting on the left.
•
Count the number of conductors needed for all devices and find the appropriate
knockouts.
•
Review the installation precautions at the front of this manual.
•
All wiring must comply with the National and/or Local codes for fire alarm
systems.
•
Do not draw wiring into the bottom 9 inches of the cabinet, except when using the
BB-17 or BB-55. This prevents interference between the power supply and
batteries.
In addition, installers should be familiar with the following
6WDQGDUGV DQG &RGHV
standards:
•
NEC Article 300 Wiring Methods.
•
NEC Article 760 Fire Protective Signaling Systems.
•
Applicable Local and State Building Codes.
•
Requirements of the Local Authority Having Jurisdiction.
,QVWDOODWLRQ
2-1