Notifier AFP-300 Installation Manual page 39

Analog fire panel
Hide thumbs Also See for AFP-300:
Table of Contents

Advertisement

Installation Checklist
AFP-300/AFP-400 Installation PN 50253:C1 05/22/97
www.PDF-Zoo.com
Task
U
Install optional peripheral devices, such as a
printer, personal computer, or CRT-2 terminal.
U
Wire the Signaling Line Circuits.
U
Connect AC power to the MPS-400 — but do not
connect batteries.
U
Check AC power—but do not connect batteries.*
U
Program the control panel.
U
Connect the batteries.
U
Field test the system.
Table 2-2 contains a checklist for checking the system with AC power applied:
&DXWLRQ

 :KLOH FKHFNLQJ $& SRZHU PDNH VXUH EDWWHULHV DUH QRW FRQQHFWHG
Component
U
The CPU
U
Each module
U
Each AVPS-24
Refer to...
CRTs" on page 2-35.
(SLC)" on page 2-39.
Supply" on page 2-32
Connections (MPS-400" on page 2-
33.
Table 2-2.
AFP-300/AFP-400 Programming
Manual.
Connections (MPS-400" on page 2-
33.
Section 3.
Table 2-1 Installation Checklist
Status
The green AC Power indicator on; the system Trouble
indicator on because of no battery power.
The yellow Trouble indicator may come on for approximately
10 seconds after applying AC power. (This only applies to an
unconfigured system.)
The yellow Trouble indicator comes on because batteries are
not connected.
Table 2-2 AC Power Checklist
 ,QVWDOODWLRQ
"Installing Remote Printers and
"Wiring a Signaling Line Circuit
"Field Wiring the MPS-400 Power
"AC and Battery Power
"AC and Battery Power
2-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afp-400

Table of Contents