Notifier AFP-300 Installation Manual page 91

Analog fire panel
Hide thumbs Also See for AFP-300:
Table of Contents

Advertisement

Wiring a Signaling Line Circuit (SLC)
,QVWDOOLQJ D &0; 0RGXOH
DV D )RUP& 5HOD\
1RWH 036,&0 1$&
&RQILJXUDWLRQV RQ SDJH 
FRQWDLQV GHWDLOHG LQIRUPDWLRQ
RQ ZLULQJ DQ 036 1$&
AFP-300/AFP-400 Installation PN 50253:C1 05/22/97
www.PDF-Zoo.com
Install a CMX module as a Form-C relay by following the instructions in Table 2-22:
Step
Action
1
Configure a CMX as a Form-C relay by using a needle-nose pliers to break off
the two tabs (J1 and J2):
&DXWLRQ

QRW DSSO\ SRZHU ZLWKRXW EUHDNLQJ WKH WDEV - DQG - 
2
Connect the SLC from the CPU to CMX terminals 1 (–) and 2 (+) as shown in
Figure 2-74.
3
Set the rotary switches on the CMX to the required SLC address. (The CMX
takes one module address on the SLC.)
4
Wire the common and the normally-open or normally-closed contacts to the
CMX (Figure 2-74).
Table 2-22 Installing a CMX Module as a Form-C Relay
6/&:LULQJZLWK&0;0RGXOHV
This section contains instructions and wiring diagrams for wiring a CMX as an NAC.
Table 2-23 lists the applications for wiring a CMX in an SLC:
CMX Function
Description
NFPA Style Y NAC
Polarized alarm notification
(two-wire)
appliances connected to a
two-wire circuit.
NFPA Style Z NAC
Polarized alarm notification
(four-wire)
appliances connected to a four-
wire circuit.
Notification Appliance
Method 1 – Notification
Power
appliance power to CMX
terminal 3 (common) and
terminal 4 (+24 VDC).
Method 2 – An alternate power
arrangement where you power
the CMX (terminals 3 and 4)
from one of the NACs on the
MPS-400.
Table 2-23 Applications for SLC Wiring with CMX Modules
&0;
%UHDNRII WDEV - DQG -
2Q DOO &0; PRGXOHV XVHG DV )RUP& UHOD\V³'R
Refer to...
Figure 2-75
Figure 2-76
Figure 2-77
Figure 2-78
 ,QVWDOODWLRQ
2-55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afp-400

Table of Contents