Figure 2-8. Installation With Drip Loop And Insulation Removal - Emerson Oxymitter 5000 Instruction Manual

Oxygen transmitter with foundation fieldbus communications
Hide thumbs Also See for Oxymitter 5000:
Table of Contents

Advertisement

Instruction Manual
IB-106-350 Rev. 1.2
April 2001
REPLACE INSULATION
AFTER INSTALLING
OXYMITTER 5000
INSULATION

Figure 2-8. Installation with Drip Loop and Insulation Removal

6. If the system has an abrasive shield,
check the dust seal gaskets. The joints
in the two gaskets must be staggered
180°. Also, make sure the gaskets are
in the hub grooves as the Oxymitter
5000 slides into the 15° forcing cone in
the abrasive shield.
If process temperatures will exceed
392°F (200°C), use anti-seize com-
pound on stud threads to ease future
removal of Oxymitter 5000.
7. Insert probe through the opening in the
mounting flange and bolt the unit to the
flange. When probe lengths selected
2-8
Installation
ADAPTOR
PLATE
NOTE
LINE
VOLTAGE
STACK OR DUCT
METAL WALL
are 9 or 12 ft (2.74 or 3.66 m), special
brackets are supplied to provide addi-
tional support for the probe inside the
flue or stack (Figure 2-6).
Uninsulated stacks or ducts may
cause ambient temperatures around
the electronics to exceed 149°F (65°C),
which may cause overheating damage
to the electronics.
8. If insulation is being removed to access
the duct work for Oxymitter 5000
mounting, make sure the insulation is
replaced afterward (Figure 2-8).
Rosemount Analytical Inc.
A Division of Emerson Process Management
Oxymitter 5000
FIELDBUS
DIGITAL
SIGNAL
DRIP
LOOP
28550007

Advertisement

Table of Contents
loading

Table of Contents