Setting Guidelines - ABB REC650 Applications Manual

Hide thumbs Also See for REC650:
Table of Contents

Advertisement

Section 14
Station communication
14.1.3
320
IEC11000056 V1 EN
Figure 143:
SMT: GOOSE receive function block with converted signals

Setting guidelines

There are two settings related to the IEC 61850–8–1 protocol:
Operation User can set IEC 61850 communication to Enabled or Disabled.
GOOSE has to be set to the Ethernet link where GOOSE traffic shall be send and received.
IEC 61850–8–1 specific data (logical nodes etc.) per included function in
an IED can be found in the communication protocol manual for IEC
61850–8–1.
1MRK 511 286-UUS A
IEC11000056-1-en.vsd
Application manual

Advertisement

Table of Contents
loading

Table of Contents