ABB Relion 670 Series Commissioning Manual
ABB Relion 670 Series Commissioning Manual

ABB Relion 670 Series Commissioning Manual

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Quick Links

®
Relion
670 SERIES
Bay control REC670
Version 2.2 IEC
Commissioning manual

Advertisement

Table of Contents
loading

Summary of Contents for ABB Relion 670 Series

  • Page 1 ® Relion 670 SERIES Bay control REC670 Version 2.2 IEC Commissioning manual...
  • Page 3 Document ID: 1MRK 511 403-UEN Issued: May 2019 Revision: E Product version: 2.2 © Copyright 2017 ABB. All rights reserved...
  • Page 4 Copyright This document and parts thereof must not be reproduced or copied without written permission from ABB, and the contents thereof must not be imparted to a third party, nor used for any unauthorized purpose. The software and hardware described in this document is furnished under a license and may be used or disclosed only in accordance with the terms of such license.
  • Page 5 This document has been carefully checked by ABB but deviations cannot be completely ruled out. In case any errors are detected, the reader is kindly requested to notify the manufacturer.
  • Page 6 (Low-voltage directive 2006/95/EC). This conformity is the result of tests conducted by ABB in accordance with the product standard EN 60255-26 for the EMC directive, and with the product standards EN 60255-1 and EN 60255-27 for the low voltage directive. The...
  • Page 7: Table Of Contents

    Checking VT circuits........................52 Using the RTXP test switch......................52 4.10 Checking the binary input/output circuits.................53 4.10.1 Binary input circuits........................53 4.10.2 Binary output circuits......................... 53 4.11 Checking optical connections....................... 53 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 8 Preparing the connection to the test equipment..............81 10.4 Connecting the test equipment to the IED.................82 10.5 Releasing the function to be tested.....................83 10.6 Verifying analog primary and secondary measurement............84 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 9 Sensitive directional residual overcurrent and power protection SDEPSDE ....98 11.4.6.1 Measuring the operate and time limit for set values............99 11.4.6.2 Completing the test.......................103 11.4.7 Thermal overload protection, one time constant, Celsius/Fahrenheit LCPTTR/LFPTTR.........................103 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 10 Completing the test....................... 121 11.5 Voltage protection......................... 121 11.5.1 Two step undervoltage protection UV2PTUV ..............121 11.5.1.1 Verifying the settings......................121 11.5.1.2 Completing the test....................... 122 11.5.2 Two step overvoltage protection OV2PTOV ................122 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 11 Measuring the operate value for the zero-sequence function ........137 11.8.2.4 Measuring the operate value for the dead line detection function......137 11.8.2.5 Checking the operation of the du/dt and di/dt based function ......... 137 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 12 11.10.1.1 Testing permissive underreaching..................163 11.10.1.2 Testing permissive overreaching..................163 11.10.1.3 Testing blocking scheme......................164 11.10.1.4 Testing delta blocking scheme................... 164 11.10.1.5 Checking of unblocking logic....................164 11.10.1.6 Completing the test.......................165 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 13 Completing the test.......................179 11.12.6 Limit counter L4UFCNT......................179 11.12.6.1 Completing the test.......................179 11.12.7 Estimation of transformer insulation life LOLSPTR ............179 11.12.7.1 Verifying the signals and settings..................179 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 14 Preparation..........................196 13.2.2.2 Recording..........................196 13.2.2.3 Secondary injection....................... 196 13.2.2.4 Alarm test..........................197 13.2.2.5 Self supervision check......................197 13.2.2.6 Trip circuit check........................197 13.2.2.7 Measurement of service currents..................197 13.2.2.8 Restoring..........................198 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 15 Diagnosing the IED status via the LHMI hint menu............202 14.2.4 Hardware re-configuration..................... 204 14.3 Repair instruction.......................... 205 14.4 Repair support..........................206 14.5 Maintenance........................... 206 Section 15 Glossary......................207 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 17: Introduction

    The commissioning personnel must have a basic knowledge of handling electronic equipment. The commissioning and maintenance personnel must be well experienced in using protection equipment, test equipment, protection functions and the configured functional logics in the IED. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 18: Product Documentation

    The manual provides instructions for the monitoring, controlling and setting of the IED. The manual also describes how to identify disturbances and how to view calculated and measured power grid data to determine the cause of a fault. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 19: Document Revision History

    Document numbers Application manual 1MRK 511 401-UEN Commissioning manual 1MRK 511 403-UEN Product guide 1MRK 511 404-BEN Technical manual 1MRK 511 402-UEN Type test certificate 1MRK 511 404-TEN Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 20: Document Symbols And Conventions

    The caution icon indicates important information or warning related to the concept discussed in the text. It might indicate the presence of a hazard which could result in corruption of software or damage to equipment or property. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 21: Document Conventions

    Edition 2 logical nodes AEGPVOC AEGGAPC AEGPVOC AGSAL AGSAL AGSAL SECLLN0 ALMCALH ALMCALH ALMCALH ALTIM ALTIM ALTMS ALTMS ALTRK ALTRK BCZPDIF BCZPDIF BCZPDIF Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 22 BICPTRC BRCPTOC BRCPTOC BRCPTOC BRPTOC BRPTOC BRPTOC BTIGAPC B16IFCVI BTIGAPC BUSPTRC_B1 BUSPTRC BUSPTRC BBSPLLN0 BUSPTRC_B2 BUSPTRC BUSPTRC BUSPTRC_B3 BUSPTRC BUSPTRC BUSPTRC_B4 BUSPTRC BUSPTRC Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 23 BZNPDIF BZNPDIF BZNPDIF_Z4 BZNPDIF BZNPDIF BZNPDIF_Z5 BZNPDIF BZNPDIF BZNPDIF_Z6 BZNPDIF BZNPDIF BZNSPDIF_A BZNSPDIF BZASGAPC BZASPDIF BZNSGAPC BZNSPDIF BZNSPDIF_B BZNSPDIF BZBSGAPC BZBSPDIF BZNSGAPC BZNSPDIF Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 24 GEN2PHAR GEN2PHAR PH1PTOC PH1PTOC EF4PTOC EF4LLN0 EF4PTRC EF4PTRC EF4RDIR EF4RDIR GEN4PHAR GEN4PHAR PH1PTOC PH1PTOC EFPIOC EFPIOC EFPIOC EFRWPIOC EFRWPIOC EFRWPIOC ETPMMTR ETPMMTR ETPMMTR Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 25 LCPTTR LCPTTR LCZSPTOC LCZSPTOC LCZSPTOC LCZSPTOV LCZSPTOV LCZSPTOV LD0LLN0 LLN0 LDLPSCH LDLPDIF LDLPSCH LDRGFC STSGGIO LDRGFC LEXPDIS LEXPDIS LEXPDIS LEXPTRC LFPTTR LFPTTR LFPTTR Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 26 PSLPSCH ZMRPSL PSLPSCH PSPPPAM PSPPPAM PSPPPAM PSPPTRC QCBAY QCBAY BAY/LLN0 QCRSV QCRSV QCRSV RCHLCCH RCHLCCH RCHLCCH REFPDIF REFPDIF REFPDIF ROTIPHIZ ROTIPHIZ ROTIPHIZ ROTIPTRC Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 27 T3WPDIF T3WPDIF T3WGAPC T3WPDIF T3WPHAR T3WPTRC TCLYLTC TCLYLTC TCLYLTC TCSLTC TCMYLTC TCMYLTC TCMYLTC TEIGAPC TEIGGIO TEIGAPC TEIGGIO TEILGAPC TEILGGIO TEILGAPC TMAGAPC TMAGGIO TMAGAPC Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 28 ZMFPDIS ZMFPTRC ZMFPTRC ZMMMXU ZMMMXU ZMHPDIS ZMHPDIS ZMHPDIS ZMMAPDIS ZMMAPDIS ZMMAPDIS ZMMPDIS ZMMPDIS ZMMPDIS ZMQAPDIS ZMQAPDIS ZMQAPDIS ZMQPDIS ZMQPDIS ZMQPDIS ZMRAPDIS ZMRAPDIS ZMRAPDIS Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 29 1MRK 511 403-UEN E Section 1 Introduction Function block name Edition 1 logical nodes Edition 2 logical nodes ZMRPDIS ZMRPDIS ZMRPDIS ZMRPSB ZMRPSB ZMRPSB ZSMGAPC ZSMGAPC ZSMGAPC Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 31: Safety Information

    Do not touch circuitry during operation. Potentially lethal voltages and currents are present. M2364-2 v1 Always use suitable isolated test pins when measuring signals in open circuitry. Potentially lethal voltages and currents are present. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 32: Caution Signs

    Whenever changes are made in the IED, measures should be taken to avoid inadvertent tripping. GUID-F2A7BD77-80FB-48F0-AAE5-BE73DE520CC2 v1 The IED contains components which are sensitive to electrostatic discharge. ESD precautions shall always be observed prior to touching components. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 33: Note Signs

    Note signs IP1497-1 v1 M19-2 v3 Observe the maximum allowed continuous current for the different current transformer inputs of the IED. See technical data. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 35: Available Functions

    Current protection PHPIOC Instantaneous phase 1-C51 2-C52 2-C53 1-C51 overcurrent protection OC4PTOC Directional phase 1-C51 2-C52 2-C53 1-C51 51_67 overcurrent protection, four steps Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 36 2-D02 protection ROV2PTOV Two step residual 2-D02 2-D02 2-D02 2-D02 overvoltage protection VDCPTOV Voltage differential protection LOVPTUV Loss of voltage check Frequency protection Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 37: Control And Monitoring Functions

    SMBRREC Autorecloser 1-H04 2-H05 3-H06 1-H04 APC10 Control functionality for a single bay, max 10 objects (1CB), including interlocking (see Table 4) Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 38 6 binary inputs TCLYLTC Tap changer control and supervision, 32 binary inputs SLGAPC Logic rotating switch for function selection and LHMI presentation Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 39 IED direct commands with position for IEC 60870-5-103 I103IEDCMD commands for IEC 60870-5-103 I103USRCMD Function commands user defined for IEC 60870-5-103 Secondary system supervision Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 40 (see Table 3) SRMEMORY, TIMERSET, XOR AND, GATE, INV, Extension LLD, OR, logic package PULSETIMER, (see Table 8) RSMEMORY, SLGAPC, SRMEMORY, TIMERSET, VSGAPC, XOR Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 41 Comparator for real inputs Table 3: Total number of instances for basic configurable logic blocks Basic configurable logic block Total number of instances GATE PULSETIMER RSMEMORY SRMEMORY TIMERSET Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 42 Total number of instances SCILO Interlocking BB_ES A1A2_BS A1A2_DC ABC_BC BH_CONN BH_LINE_A BH_LINE_B DB_BUS_A DB_BUS_B DB_LINE ABC_LINE AB_TRAFO SCSWI Switch controller SXSWI Circuit switch Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 43 Table 7: Total number of instances for configurable logic blocks Q/T Configurable logic blocks Q/T Total number of instances ANDQT INDCOMBSPQT INDEXTSPQT INVALIDQT Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 44 General service value presentation of analog inputs EVENT Event function DRPRDRE, Disturbance A4RADR, report SPGAPC Generic communicati on function for Single Point indication Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 45 60870-5-103 I103MEASUSR Measurands user defined signals for 60870-5-103 I103AR Function status auto- recloser for 60870-5-103 I103EF Function status earth- fault for IEC 60870-5-103 Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 46 2-M22 monitoring CHMMHAI ITHD Current harmonic monitoring, 3 phase VHMMHAI VTHD Voltage harmonic monitoring, 3 phase Metering PCFCNT Pulse-counter logic ETPMMTR Function for energy calculation and demand handling Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 47: Communication

    LD0LLN0 IEC 61850 LD0 LLN0 SYSLLN0 IEC 61850 SYS LLN0 LPHD Physical device information PCMACCS IED configuration protocol FSTACCS Field service tool access Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 48 6/3/3 LDCMRecBinStat2 from remote LDCM LDCMRecBinStat3 LDCMRecBinS2_2M Receive binary status from LDCM, 2Mbit LDCMRecBinS3_2M Receive binary status from remote LDCM, 2Mbit Scheme communication Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 49: Basic Ied Functions

    INTERRSIG Self supervision with internal event list TIMESYNCHGEN Time synchronization module BININPUT, Time synchronization SYNCHCAN, SYNCHGPS, SYNCHCMPPS, SYNCHLON, SYNCHPPH, SYNCHPPS, SNTP, SYNCHSPA Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 50 General LED indication part for LHMI OPENCLOSE_LED LHMI LEDs for open and close keys GRP1_LED1– Basic part for CP HW LED indication module GRP1_LED15 GRP2_LED1– GRP2_LED15 GRP3_LED1– GRP3_LED15 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 51: Starting Up

    • Administration rights on the PC, to set up IP addresses • Product documentation (engineering manual, installation manual, commissioning manual, operation manual, technical manual and communication protocol manual) Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 52: Checking The Power Supply

    ‘IED Startup’. The main menu is displayed and the upper row should indicate ‘Ready’ after about 90 seconds. A steady green light indicates a successful startup. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 53: Setting Up Communication Between Pcm600 And The Ied

    IP address when the IED is delivered. The IP adress and the subnetwork mask might have to be reset when an additional Ethernet interface is installed or an interface is replaced. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 54 Select Search programs and files in the Start menu in Windows. IEC13000057-1-en.vsd IEC13000057 V1 EN-US Figure 3: Select: Search programs and files Type View network connections and click on the View network connections icon. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 55 IEC13000059 V1 EN-US Figure 5: Right-click Local Area Connection and select Properties Select the TCP/IPv4 protocol from the list of configured components using this connection and click Properties. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 56 IEC13000062 V1 EN-US Figure 7: Select: Use the following IP address ping command to verify connectivity with the IED. Use the Close all open windows and start PCM600. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 57: Writing An Application Configuration To The Ied

    CTs is properly connected to the station earth and only at one electrical point. • Insulation resistance check. While the CT primary is energized, the secondary circuit shall never be open circuited because extremely dangerous high voltages may arise. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 58: Checking Vt Circuits

    IED is in test mode. Before removing the test handle, check the measured values in the IED. Not until the test handle is completely removed, the trip and alarm circuits are restored for operation. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 59: Checking The Binary Input/Output Circuits

    An IED equipped with optical connections has an minimum space requirement of 180 mm for plastic fiber cables and 275 mm for glass fiber cables. Check the allowed minimum bending radius from the optical cable manufacturer. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 61: Configuring The Ied And Changing Settings

    The primary CT data are entered via the HMI menu under Main menu/Configurations/Analog modules The following parameter shall be set for every current transformer connected to the IED: Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 62: Supervision Of Input/Output Modules

    Each logical I/O module has an error flag that indicates signal or module failure. The error flag is also set when the physical I/O module of the correct type is not detected in the connected slot. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 63: Establishing Connection And Verifying The Spa/Iec Communication

    SlaveAddress and BaudRate for the rear IEC port on the local HMI under Main Set the menu/Configuration/Communication/Station communication/IEC60870-5-103/ OPTICAL103:1. Use the same settings for these as is set in the SMS system for the IED. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 64: Verifying The Communication

    ITU (CCITT) characteristics. Table 13: Max distances between IEDs/nodes glass < 1000 m according to optical budget plastic < 25 m (inside cubicle) according to optical budget Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 65: Optical Budget Calculation For Serial Communication With Spa/Iec

    Losses in connection box, two contacts (1 dB/ 2 dB contact) Margin for 2 repair splices (0.5 dB/splice) 1 dB Maximum total attenuation 11 dB 7 dB Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 67: Establishing Connection And Verifying The Lon Communication

    IEDs via bay-to-bay horizontal communication. For LON communication an SLM card should be ordered for the IEDs. The fiber optic LON bus is implemented using either glass core or plastic core fiber optic cables. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 68: The Lon Protocol

    ServicePinMsg = Yes . The node address is sent to LNT via the LON bus, or LNT can scan the network for new nodes. The communication speed of the LON bus is set to the default of 1.25 Mbit/s. This can be changed by LNT. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 69 Communication/Station communication/Port configuration/SLM optical LON pot/Service Pin Messae/Generate service pin message Table 19: LON commands Command Command description ServPinMess Command with confirmation. Transfers the node address to the LON Network Tool. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 70: Optical Budget Calculation For Serial Communication With Lon

    Losses in connection box, two contacts (0.75 dB/contact) 1.5 dB Losses in connection box, two contacts (1dB/contact) 2 dB Margin for repair splices (0.5 dB/splice) 0.5 dB Maximum total attenuation 11 dB 7 dB Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 71: Establishing Connection And Verifying The Iec 61850 Communication

    Verifying redundant IEC 61850-8-1 communication Ensure that the IED receives IEC 61850-8-1 data on the selected Ethernet ports. Browse in the local HMI to Main menu/Diagnostics/Communication/Ethernet status/Access point/ Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 72 (depending on which connection that was removed) is shown as Ok . Be sure to re-connect the removed connection after completed other signal is shown as verification. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 73: Establishing Connection And Verifying The Ieee C37.118/1344 Communication

    Mode , IPAddress and IPMask . Mode must be set to Normal . 1.3. Check that the correct IP address is assigned to the port. Set the TCP communication parameters by navigating to: Main menu/Configuration/ Communication/Station communication/phasor measurement/PMU Configuration/ Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 74: Setting The Tcp/Udp Client Communication

    IEEE C37.118 connection with the PMU: Set the IP stack on PMU Connection Tester to IPv4. Note that the default IP stack on PMU Connection Tester tool is IPv6. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 75 (IDCODE). The PMU Data Stream ID Number is a user assigned ID number (1-65534) for each data stream sent out from the PMU and it is defined under parameter Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 76 1 (Default value: 4713). This can be found under the parameter TCPportUDPdataCtrl1 as one of the UDP communication parameters. 3.5. Save the Alternate Command Channel Configuration settings. 3.6. Continue to the section Verifying the IEEE C37.118/1344 UDP communication Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 77: Verifying The Communication

    Frequency, data Reporting Rate, Phasor names, and Phase angles of the reported synchrophasors. Observe the real-time frame details of the Data Frame in the bottom of the window. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 78 Open the drop-down menu in the sent from the client (PMU Connection Tester) to the PMU. Try different commands and make sure that the PMU is receiving and responding to them. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 79 If the HeaderFrame is not included, ask the PMU to send the header frame via the Header Frame command (Previous stage). Open each message type and observe the content of each message. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 80 It is also possible to capture the IEEE C37.118 synchrophasor data in an Excel file. This is done by navigating to File/Capture/Start Stream Debug Capture... The tool will ask to Set Stream Debug Capture File Name and path to save the capture file. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 81 Figure 14: Start capturing the IEEE C37.118 synchrophasor data • The synchrophasor data capturing process can be stopped at any point of time by navigating to File/Capture/Stop Stream Debug Capture... Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 82 Phasor names on top of each column (See figure 16), the capture process should start before connecting the PMU Connection Tester to the PMU, i.e. first start the capturing and Connect . then click Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 83: Verifying The Ieee C37.118/1344 Udp Communication

    Now it should be possible to see the streaming synchrophasor data. • Verify the communication by following the same steps as in section Verifying the IEEE C37.118/1344 TCP communication. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 84: Optical Budget Calculation For Pmu - Pdc Communication

    Losses in the connectors and splices are typically 0.3dB/connection. The user must reserve 3dB spare for the uncertainty of the measurements. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 85: Section 10 Testing Ied Operation

    Service values on the local HMI (logical signals or phasors) • A PC with PCM600 application configuration software in work online mode All setting groups that are used should be tested. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 86: Preparing The Ied To Verify Settings

    IED. To make testing even more effective, use PCM600. PCM600 includes the Signal monitoring tool, which is useful in reading the individual currents and voltages, their amplitudes and Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 87: Activating The Test Mode

    The IED can be equipped with a test switch of type RTXP8, RTXP18 or RTXP24. The test switch and its associated test plug handle (RTXH8, RTXH18 or RTXH24) are a part of the COMBITEST system, which provides secure and convenient testing of the IED. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 88: Connecting The Test Equipment To The Ied

    IED under test. To ensure correct results, make sure that the IED as well as the test equipment are properly earthed before testing. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 89: Releasing The Function To Be Tested

    The Function test modes menu is located in the local HMI under Main menu/Test/ Function test modes. Browse to the function instance that needs to be released. Blocked for the selected function to No . Set parameter Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 90: Verifying Analog Primary And Secondary Measurement

    Main menu/Configuration/Analog modules If the IEC/UCA 61850-9-2LE communication is interrupted during current injection, the report tool in PCM600 will display the current that was injected before the interruption. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 91: Testing The Protection Functionality

    IED logic configuration. Be observant that forcing of binary inputs and outputs on an IED, with inappropriate setup, can result in potential danger. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 92: How To Enable Forcing

    Edit the input/output value directly to select the desired logical level, by doing following: Select the value line of the desired signal, see figure 21. Press the Enter key to edit the value. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 93 • Set the status of a signal to Forced, in the forcing menu that corresponds to the I/O card in question. See example of LHMI menu in figure Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 94: Forcing By Using Pcm600

    Start editing signal value for forcing on the tool bar. Click IEC15000024 V1 EN-US The Signal Monitoring menu changes and indicates the forcing values that can be edited. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 95: How To Undo Forcing Changes And Return The Ied To Normal Operation

    This means that logic input signals may activate functions in the IED and that output relays may change state, which can be potentially dangerous. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 96: Undo Forcing By Using Testmode Component

    LHMI. If the IED is left in test mode, then it is still possible to perform new forcing operations, both from LHMI and from PCM600 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 97: Section 11 Testing Functionality By Secondary Injection

    2.3. Refresh the window Create Report or Open With to export the recordings to any 2.4. Right-click and select disturbance analyzing tool that can handle Comtrade formatted files. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 98: Event Recorder (Er) And Event List (El)

    High impedance differential protection HZPDIF SEMOD55257-42 v3 Prepare the IED for verification of settings as outlined in section "Requirements" section "Preparing for test" in this chapter. 11.3.1.1 Verifying the settings SEMOD55257-46 v5 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 99: Completing The Test

    The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI. To verify the settings the following fault type should be tested: • Phase-to-earth fault Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 100: Measuring The Operate Limit Of Set Values

    1 out of 3 currents are chosen for operation: Connect the injection current to phases L1 and neutral. 2 out of 3 currents are chosen for operation: Connect the injection current into phase L1 and out from phase L2. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 101: Completing The Test

    Values of the logical signals for EFPIOC are available on the local HMI under Main menu/Tests/ Function status/Current protection/InstResidualOverCurrent(50N,IN>>)/ EFPIOC(50N;IN>>):x, where x = 1, 2, and 3. The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 102: Measuring The Operate Limit Of Set Values

    RCA+ 180°. Increase the injected current and note the value at which the studied step of the function operates. Decrease the current slowly and note the reset value. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 103: Four Step Non-Directional Earth Fault Protection

    ( forward directional function is selected. If reverse directional function is selected, set the injection current to lag the polarizing voltage by an angle equal to RCA. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 104: Completing The Test

    Figure 23: Principle connection of the test set Values of the logical signals belonging to the sensitive directional residual overcurrent and power protection are available on the local HMI under Main menu/Test/Function status/ Current protection/SensDirResOvCurr(67N,IN>)/SDEPSDE(67N,IN>):x Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 105: Measuring The Operate And Time Limit For Set Values

    UNRel> . online mode. Compare the voltage with the set value Continue to test another function or complete the test by setting the test mode to Off . Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 106 Section 11 1MRK 511 403-UEN E Testing functionality by secondary injection RCADir Operate area 3 × ROADir IEC06000650_2_en.vsd IEC06000650 V2 EN-US Figure 24: Characteristic with ROADir restriction Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 107 The expected value depends on whether definite or inverse time was selected. Off . Continue to test another function or complete the test by setting the test mode to Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 108 The function activates the START and STDIRIN output. Measure the operate time of the timer by injecting a current of 200% of the operate value. Compare the result with the expected value. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 109: Completing The Test

    Take the TEMP readings. TripTemp . Compare with the setting of Activate the BLOCK binary input. The signals ALARM, START and TRIP should disappear. Reset the BLOCK binary input. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 110: Completing The Test

    Switch off the injection current and check from the service menu readings of thermal status and LOCKOUT that the lockout resets at the set percentage of heat content. IBase2 . Activate the cooling input signal to switch over to base current Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 111: Completing The Test

    Repeat the fault condition and increase the current in steps until trip appears. Note that the START signal shall be re-applied for each new current value. IN> . Compare the result with the set Disconnect AC and START input signals. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 112: Checking The Re-Trip And Back-Up Times

    . It may be made at issue Interrupt the current, with a margin before back-up trip time, of re-trip command. Check that re-trip is achieved, if selected, but no back-up trip is obtained. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 113: Verifying Instantaneous Back-Up Trip At Cb Faulty Condition

    Verify that backup trip is not achieved. RetripMode = Contact 11.4.9.8 Verifying the case M12104-213 v10 RetripMode = Contact . It is assumed that re-trip without current check is selected, Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 114: Verifying The Case Functionmode = Current Or Cb Pos

    IPh> value. Apply START signal, and after 1.5 s apply the current above the set Check that STALARM signal is set after 1.0 s and backup trip is blocked. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 115: Verifying That Backup Signal Is Released When Stalarm Is Reset

    Prepare the IED for verification of settings outlined in Section "Preparing the IED to verify settings". Logical signals for STBPTOC protection are available on the local HMI underMain menu/ Settings/IED Settings/Current protection/Stub(PTOC,50STB)/STBPTOC:x Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 116: Measuring The Operate Limit Of Set Values

    Reset both BLKDBYAR and EXTPDIND binary inputs. Activate the BLOCK binary input. Activate EXTPDIND binary input. NO TRIP signal should appear. Reset both BLOCK and EXTPDIND binary inputs. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 117: Completing The Test

    If a three-phase test set is available this could be used for all the modes. If a single-phase current/voltage test set is available the test set should be connected to a selected input for one-phase current and voltage. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 118 Switch the current off and measure the time for activation of TRIP1, trip of stage 1. If a second stage is used, repeat steps for the second stage. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 119: Completing The Test

    Prepare the IED for verification of settings as outlined in section "Requirements" section "Preparing for test" in this chapter. 11.4.14.1 Measuring the operate and time limit of set values SEMOD175021-7 v6 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 120: Completing The Test

    Single- or three-phase test equipment can be used but it may be required to have facility to vary the frequency of the injected current signal(s). 11.4.15.1 Verifying the settings and operation of the function GUID-81B167DE-7A86-4CBA-86E7-560A6B3EA665 v1 Reconnection inhibit feature GUID-C3E7B2EA-FF69-4D2B-BBDF-A135A97E4862 v2 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 121 Check that service value from the function for current in phase L1, on the local HMI under Main menu/Test is approximately 185A (that is, 0.370A · (500/1) = 185A). Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 122 Therefore it is recommended to switch them off during this test. Procedure to test inverse time delayed step: Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 123 Above procedure can also be used to test definite time step. Pay attention that IDMT step can also operate during such injection. Therefore make sure that appropriate settings are entered in order to insure correct test results for definite time step. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 124: Completing The Test

    CTprim (Equation 17) IECEQUATION2434 V1 EN-US Example (rated secondary current = 1A): CT ratio 10 000/1A VT ratio 10 kV/100 V StartCurr 100% Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 125 TROC and TRIP will operate after a time defined by the equation: 13 5    −    StartCurr (Equation 18) IECEQUATION2435 V1 EN-US Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 126 Measure the definite time delay for the TRUV and TRIP signals and compare it with the tDef_UV . set value Check that start and operate information is stored in the event menu. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 127: Completing The Test

    For example, if the inverse time curve A is selected, the trip signals TR1 and TRIP operate after a time corresponding to the equation:   −   <   (Equation 22) IECEQUATION2428 V1 EN-US Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 128: Completing The Test

    (Equation 24) IECEQUATION2427 V1 EN-US Decrease the voltage slowly and note the reset value. Set and apply about 20% higher voltage than the measured operate value for one phase. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 129: Extended Testing

    Operate time in seconds Settable time multiplier of the function for step 1 Measured voltage U1> Set start voltage for step 1 Repeat the test for Step 2 of the function. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 130: Completing The Test

    Decrease slowly the voltage in phase UL1 of the test set until the START signal resets. Check U1 blocking level by comparing the voltage level at reset with the set undervoltage U1Low . blocking U1Low for the other phases. Repeat steps to check Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 131: Check Of Voltage Differential Trip And Alarm Levels

    U2Low . blocking 11.5.4.2 Check of voltage differential trip and alarm levels SEMOD175258-104 v3 Procedure Connect voltages to the IED according to valid connection diagram and figure 29. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 132: Check Of Trip And Trip Reset Timers

    Set Ur (rated voltage) to the U1 inputs and increase U2 voltage until differential voltage is UDTrip ). 1.5 · operating level ( Switch on the test set. Measure the time from activation of the START signal until TRIP signal is activated. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 133: Final Adjustment Of Compensation For Vt Ratio Differences

    Activate the CBOPEN binary input. Simultaneously disconnect all the three-phase voltages from the IED. No TRIP signal should appear. tRestore time. Inject the measured voltages at rated values for at least set Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 134: Completing The Test

    M16289-31 v6 The test above can be repeated to check the time to reset. The tests above can be repeated to test the frequency dependent inverse time characteristic. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 135: Completing The Test

    Supply the IED with three-phase voltages at their rated values. Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN signal appears. Note the voltage magnitude value and compare it with the set value. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 136: Completing The Test

    Frequency time accumulation protection function FTAQFVR GUID-F7BD8E10-EF88-4698-87F4-0D4365004705 v2 Prepare the IED for verification of settings as outlined in section “Overview” and section “Preparing for test” in this chapter. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 137: Verifying The Settings

    Activate the CBOPEN input signal. CurrStartLevel value until the START signal Slowly decrease the injected current below the disappears. Compare the current magnitude value to the set value. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 138: Completing The Test

    CVGAPC function block, it is hardly possible to define a fully covering general commissioning test. 11.7.1.1 Built-in overcurrent feature (non-directional) SEMOD56488-9 v5 Procedure Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 139: Overcurrent Feature With Current Restraint

    START value (to which the overcurrent ratio has to be calculated) is the actual pickup value as got with actual restraining from the voltage restraining quantity. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 140: Overcurrent Feature With Directionality

    "Preparing the IED to verify settings". The Current circuit supervision function CCSSPVC is conveniently tested with the same three- phase test set as used when testing the measuring functions in the IED. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 141: Verifying The Settings

    SealIn “on” or “off”. If “on” no reset, if “off” reset. depends on the setting After more than 5 seconds disconnect the remaining two-phase voltages and all three currents. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 142: Measuring The Operate Value For The Negative Sequence Function

    IECEQUATION00022 V2 EN-US Compare the result with the set value of the negative-sequence operating current. 3I2< is in percentage of the base current IBase . Consider that the set value Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 143: Measuring The Operate Value For The Zero-Sequence Function

    11.8.2.5 Checking the operation of the du/dt and di/dt based function M1405-96 v12 Check the operation of the du/dt and di/dt based function if included in the IED. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 144: Completing The Test

    MAINFUF or PILOTFUF should change to Set normal conditions as mentioned in step 1. Enable the BLOCK binary input and repeat step 2. MAINFUF or PILOTFUF should not appear. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 145: Completing The Test

    Based on the mode of operation, carry out the following changes on input condition of Step to detect start condition. Each mode is given for increase and decrease operation. (3-a and 3-b) Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 146: Completing The Test

    Based on the mode of operation, carry out the following changes on input condition of Step to detect start condition. Each mode is given for increase and decrease operation. (3-a and 3-b) Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 147: Completing The Test

    TestMode setting to Off . Continue to test another function or end the test by changing the Restore connections and settings to their original values, if they were changed for testing purposes. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 148: Control

    Figure shows the general test connection for a 1½ breaker diameter with one-phase voltage connected to the line side. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 149: Testing The Synchronizing Function

    Testing the synchronizing function M2377-21 v8 The voltage inputs used are: UP3LN1 UL1, UL2 or UL3 line 1 voltage inputs on the IED UP3BB1 Bus1 voltage input on the IED Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 150: Testing The Synchrocheck Functionality

    Increase the U-Bus to 110% GblBaseSelBus , and the U-Line = 90% GblBaseSelLine and also the opposite condition. Check that the two outputs for manual and auto synchronism are not activated. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 151 If a modern test set is used, the frequency can be changed continuously. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 152: Testing The Energizing Check

    GblBaseSelBus . The outputs should not be activated. The test can be repeated with different values on the U-Bus and the U-Line. Testing both directions (DLLB or DBLL) M2377-306 v7 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 153: Testing The Voltage Selection

    Record the voltage selection tests in a matrix table showing read values and AUTOSYOK/ MANSYOK signals to document the test performed. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 154 1 ½ bus WA2 – LINE2_QB B2SEL, (Operates on alt. CB LINE2 LN2SEL WA2_QA1) (mirrored) WA2 – TIE_QA1 LINE1_QB B2SEL, LINE1 LN1SEL WA2 – TIE_QA1 WA1_QA1 B1SEL, B2SEL Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 155: Completing The Test

    The verification test is performed together with protection and trip functions. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 156 (CB) is simulated by an external bi-stable relay (BR), for example a relay type RXMVB2 or RXMD or Breaker Simulator of ABB. The following manual switches are used: • switch or push-button to close (SC) •...
  • Page 157: Preparation Of The Verification

    Switching the auto recloser to On and Off M12400-79 v9 Operation setting to Off and check the state. Set the Operation setting to On and check the state, including SETON and READY . Set the Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 158: Verifying The Auto Recloser

    Start without the blocking or inhibit signal, and then run a sequence with the blocking or inhibit signal added. Checking the influence of the INHIBIT signal M12400-129 v5 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 159 See the application manual for an illustration of typical interconnections. START , WAIT , and The two auto reclosers can be checked individually by carefully applying INHIBIT signals. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 160: Completing The Test

    Secondary injection of load current (I ) and secondary bus voltage (U ) equivalent quantities are required during installation and commissioning tests. The test consists mainly of: Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 161 It is important to review these settings and confirm the intended response of the voltage control function for different secondary injection tests. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 162: Secondary Test

    Transformer Tap Control = On and Transformer Voltage Control = On • Direct tap change control Main menu/Settings/IED Settings/Control/TransformerTapChanger(YLTC,84)/ TCMYLTC:x/TCLYLTC:x/Operation • Automatic transformer voltage control Main menu/Settings/IED Settings/Control/TransformerVoltageControl(ATCC,90)/ TR1ATCC:x/TR8ATCC:x/General/Operation • Enable Tap Command Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 163: Check The Normal Voltage Regulation Function

    TR8ATCC:n/Voltage/Umax Umin and Confirm the voltage control function response to an applied voltage below Umax , by reviewing the settings in the local HMI under Main menu/Settings/IED above Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 164: Check The Overcurrent Block Function

    By separation of real and imaginary parts: × × ul re ub re rline il re xline il im (Equation 32) EQUATION2082 V1 EN-US Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 165: Parallel Voltage Regulation

    T2RXOP shall be set to On in instance 3 of TR8ATCC, • T2RXOP and T3RXOP shall be set to On in instance 1 of TR8ATCC, and so on. • Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 166 ) and subsequent ( t2 ) tap change commands from Review the expected time for first ( the master transformer in the local HMI under Main menu/Settings/IED Settings/ TransformerVoltageControl(ATCC,90)/TR1ATCC:x/TR8ATCC:x/Time/t1 and t2 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 167 Transformer 2 and a lower command for Transformer 1. Magnitude and direction of circulating currents measured for each transformer can be observed as Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 168: Completing The Test

    Steady or Pulse , and by observing the logic statuses of the corresponding binary output. Command control functions included in the operation of different built-in functions must be tested at the same time as their corresponding functions. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 169: Interlocking

    Apply healthy normal load conditions to the IED for at least two seconds. Apply a fault condition within the permissive zone. Check that correct trip outputs, external signals, and indication are obtained for the actual type of fault generated. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 170: Testing Blocking Scheme

    11.10.1.5 Checking of unblocking logic M13868-72 v4 Check the unblocking function (if the function is required) when checking the communication scheme. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 171: Completing The Test

    The user might need to block the reverse zone timer setting during testing of current reversal. The forward zone timer must be set longer than the tDelayRev set value. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 172: Weak End Infeed Logic

    TESTMODE setting to Off . continue to test another function or end the test by changing the Restore connections and settings to their original values, if they were changed for testing purposes. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 173: Local Acceleration Logic Zclcpsch

    . Compare the measured time with the set value Activate the CR binary input. Check that the CRL output is activated when the CR input is activated. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 174: Completing The Test

    TESTMODE setting to Off . continue to test another function or end the test by changing the Restore connections and settings to their original values, if they were changed for testing purposes. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 175: Current Reversal And Weak-End Infeed Logic For Residual Overcurrent Protection Ecrwpsch

    Switch off the current and check that the ECHO and CS appear on the corresponding binary output during 200ms after resetting the directional element. Switch off the CRL binary input. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 176 200ms after resetting the directional element. If EF4PTOC also operates in forward direction, CS should be obtained. Switch the polarizing voltage off and reset the CRL binary input. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 177: Completing The Test

    SMBRREC. A three-phase trip should occur for each separate fault and all of the trips. Functional outputs TRIP, all TRLn and TR3P should be active at each fault. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 178: 1Ph/2Ph/3Ph Operating Mode

    Initiate a single phase-to-earth fault and switch it off immediately when the trip signal is generated for the corresponding phase. Initiate the second single-phase-to-earth fault in tEvolvingFault (default one of the remaining phases within the time interval, shorter than Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 179: Circuit Breaker Lockout

    Values of logical signals for SSIMG protection are available on the local HMI under Main menu/ Tests/Function status/Monitoring/InsulationGas(63)/SSIMG(63):x, where x = 1, 2,..21. The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 180: Testing The Gas Medium Supervision For Pressure Alarm And Pressure Lockout Conditions

    Check that the input logical signal BLOCK is logical zero and that on the local HMI, the logical signals LVLALM, LVLLO, TEMPALM, TEMPLO, ALARM and LOCKOUT are logical zero. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 181: Testing The Liquid Medium Supervision For Level Alarm And Level Lockout Conditions

    If current need to be injected for a particular test, it should be done in the phase selected by the PhSel parameter. Follow the sequence for positioning the auxiliary contacts before testing: Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 182 9.2. Enable SPRCHRST input. Also activate SPRCHRD after a time greater than set time SpChAlmTime . 9.3. At this condition, SPCHALM is activated. 10. Test of CB gas pressure indication Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 183: Completing The Test

    HMI under Main menu/Disturbance Records/ Disturbance #n(n = 1–100)/General Information If PCM600 is used, the result is displayed on the recording list after upload, including loop selection information. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 184: Measuring The Operate Limit

    = set test point on the test set = set zero-sequence reactance of a line = set positive-sequence reactance of a line = set mutual zero-sequence impedance of a line Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 185: Completing The Test

    Supply three-phase currents slightly more than the rated value to the IED and take note of hot spot temperature (HPTMPMAX). Observe the maximum permitted overloading of the current circuits in the IED. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 186: Completing The Test

    Prepare the IED for verification of settings outlined in Section "Preparing the IED to verify settings". 11.12.8.1 Verifying the signals and settings GUID-0295EF7C-217E-4400-B7C2-68C00A38ADF3 v1 The voltage or current can be injected using a common test equipment. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 187: Completing The Test

    Prepare the IED for verification of settings outlined in Section "Preparing the IED to verify settings". 11.12.9.1 Verifying the signals and settings GUID-026F1A4F-E9A8-43DC-87E1-0831E0123E50 v1 The current can be injected using common test equipment. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 188: Completing The Test

    Supply the IED with voltage at rated value. Apply harmonics at the numerical multiple of fundamental frequency along with the injected voltage signal. Slowly increase the harmonic amplitudes until the THDWRN signal appears. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 189: Completing The Test

    Ensure the instantaneous values of active and reactive power from CVMMXN function block are connected to ETPMMTR function block active and reactive power inputs. EnaAcc setting and set tEnergy as 1 minute. Enable the Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 190: Completing The Test

    TESTMODE setting to Off . continue to test another function or end the test by changing the Restore connections and settings to their original values, if they were changed for testing purposes. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 191: Station Communication

    (BO). Check at End2 that the BI signal is received and the BO operates. Repeat the test for all the signals configured to be transmitted over the communication link. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 192: Basic Ied Functions

    TESTMODE setting to Off . continue to test another function or end the test by changing the Restore connections and settings to their original values, if they were changed for testing purposes. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 193: Exit Test Mode

    Navigate to the test mode folder. On setting to Off . Press the 'E' key and the left arrow key. Change the YES , press the 'E' key and exit the menus. Answer Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 195: Section 12 Primary Injection Testing

    Rline and Xline . Zero , this test is omitted. If the function LDC is set to Open the voltage control display on the LHMI in Main Menu/Control/Commands/ TransformerVoltageControl (ATCC, 90). Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 196: Voltage Control Of Parallel Transformers

    IEDs or between instances of voltage control in the same IED. For parallel operation, it is also recommended to confirm the setting for the general parallel arrangement of transformers in Main menu/Settings/IED Settings/Control/ Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 197: Minimum Circulating Current (Mcc) Method

    Set the control mode to Comp on the local HMI in Main menu/ For transformer T1, adjust the parameter Settings/IED Settings/Control/TransformerVoltageControl(ATCC,90)/TR8ATCC:x/ ParCtrl/Compso that the LOWER output is activated due to circulating current. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 198: Master Follower (Mf) Method

    Set the control mode to Manual for each transformer in the parallel control group Open the test display for Transformer Voltage Control on the LHMI in Main menu/Test/ Function status/Control/TransformerVoltageControl (ATCC, 90). Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 199: Completing The Test

    After the test is completed and relevant disturbance records are saved to document the test, go to Main menu/Clear on the local HMI and clear all LEDs, the process eventlist and disturbances from the IED. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 201: Section 13 Commissioning And Maintenance Of The Fault Clearing System

    The periodicity of all tests depends on several factors, for example the importance of the installation, environmental conditions, simple or complex equipment, static or electromechanical IEDs, and so on. The normal maintenance praxis of the user should be followed. However, ABB's recommendation is as follows: Every second to third year •...
  • Page 202: Visual Inspection

    ABB protection IEDs are preferably tested by aid of components from the COMBITEST testing system described in information B03-9510 E. Main components are RTXP 8/18/24 test switch usually located to the left in each protection IED and RTXH 8/18/24 test handle, which is inserted in test switch at secondary testing.
  • Page 203: Alarm Test

    IED. The service values are checked on the local HMI or in PCM600. Ensure that the correct values and angles between voltages and currents are Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 204: Restoring

    Thus a list should be prepared of all items disturbed during test so that all can be put back into service quickly and without overlooking something. It should be put back into service item by item and signed by the responsible engineer. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 205: Section 14 Troubleshooting

    No problem detected. None. Time synch Fail No time Check the synchronization source for problems. synchronization. If the problem persists, contact your ABB representative for service. Real time clock Ready No problem detected. None. Real time clock Fail The real time clock has Set the clock.
  • Page 206: Fault Tracing

    Ready (I/O module name) I/O modules has failed. Check that the I/O module has been configured and Fail connected to the IOP1- block. If the problem persists, contact your ABB representative for service. 14.2 Fault tracing IP8765-1 v1 14.2.1 Internal fault indications...
  • Page 207: Using Front-Connected Pc

    40 events. The list is based on the FIFO principle, when it is full, the oldest event is overwritten. The list cannot be cleared and its content cannot be erased. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 208: Diagnosing The Ied Status Via The Lhmi Hint Menu

    This condition will be indicated with a sub-menu under Hints, where details about this condition are shown. The Hint menu is a way to assist the user in troubleshooting. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 209 GOOSE protocol from the access point in the Ethernet configuration in PCM600 or LHMI. Please enable GOOSE on access points: AP_FRONT, AP_1 Table continues on next page Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 210: Hardware Re-Configuration

    Switch the IED off and remove the HW module. Switch the IED on, wait for it to start, and then perform a HW reconfig. Perform a license update in PCM 600. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 211: Repair Instruction

    M11764-10 v1 An alternative is to open the IED and send only the faulty circuit board to ABB for repair. When a printed circuit board is sent to ABB, it must always be placed in a metallic, ESD-proof, protection bag. The user can also purchase separate replacement modules.
  • Page 212: Repair Support

    Repair support M11768-3 v3 If an IED needs to be repaired, the whole IED must be removed and sent to an ABB Logistic Center. Before returning the material, an inquiry must be sent to the ABB Logistic Center. e-mail: offer.selog@se.abb.com 14.5...
  • Page 213: Section 15 Glossary

    CAN carrier module CCVT Capacitive Coupled Voltage Transformer Class C Protection Current Transformer class as per IEEE/ ANSI CMPPS Combined megapulses per second Communication Management tool in PCM600 Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 214 Dynamic random access memory Disturbance report handler Digital signal processor Direct transfer trip scheme Ethernet configuration tool EHV network Extra high voltage network Electronic Industries Association Electromagnetic compatibility Electromotive force Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 215 IEC 60870-5-103 Communication standard for protection equipment. A serial master/ slave protocol for point-to-point communication IEC 61850 Substation automation communication standard IEC 61850–8–1 Communication protocol standard Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 216 Local operating network Miniature circuit breaker Mezzanine carrier module Milli-ampere module Main processing module MVAL Value of measurement Multifunction vehicle bus. Standardized serial bus originally developed for use in trains. Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 217 A balanced serial interface for the transmission of digital data in point- to-point connections RS485 Serial link according to EIA standard RS485 Real-time clock Remote terminal unit Substation Automation Select-before-operate Switch or push button to close Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 218 Transmit (disturbance data) TNC connector Threaded Neill-Concelman, a threaded constant impedance version of a BNC connector Trip (recorded fault) TPZ, TPY, TPX, TPS Current transformer class according to IEC Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 219 Three times zero-sequence current.Often referred to as the residual or the earth-fault current Three times the zero sequence voltage. Often referred to as the residual voltage or the neutral point voltage Bay control REC670 Commissioning manual © Copyright 2017 ABB. All rights reserved...
  • Page 222 ABB AB Grid Automation Products SE-721 59 Västerås, Sweden Phone +46 (0) 21 32 50 00 Scan this QR code to visit our website www.abb.com/protection-control © Copyright 2017 ABB. All rights reserved.

This manual is also suitable for:

Relion rec670

Table of Contents