ABB REC650 Applications Manual page 200

Hide thumbs Also See for REC650:
Table of Contents

Advertisement

Section 10
Control
194
This setting is used to compensate the phase shift between the measured bus voltage and
line voltage when:
a. different phase-neutral voltages are selected (for example UL1 for bus and UL2 for
line);
b. one available voltage is phase-phase and the other one is phase-neutral (for
example UL1L2 for bus and UL1 for line).
The set value is added to the measured line phase angle. The bus voltage is reference
voltage.
If single phase UL1 or two-phase UL1L2 is not available, parameters
PhaseShift and URatio can be used to compensate for other choices.
Table 14:
Line voltage
UL1
UL1L2
UL1
Synchronizing settings
OperationSynch
The setting Disabled disables the Synchronizing function. With the setting Enabled, the
function is in service and the output signal depends on the input conditions.
FreqDiffMin
Voltage settings examples
Bus voltage
Bus voltage pre-
processing
UL1
Connect UL1 to
channel 1
UL2
Connect UL2 to
channel 1
UL3
Connect UL3 to
channel 1
UL1L2
Connect UL1L2
to channel 1
UL2L3
Connect UL2L3
to channel 1
UL3L1
Connect UL3L1
to channel 1
UL1L2
Connect UL1L2
to channel 1
UL2L3
Connect UL2L3
to channel 1
UL3L1
Connect UL3L1
to channel 1
1MRK 511 286-UUS A
SESRSYN setting
PhaseShift
URatio
-
1
- 120º
1
+ 120º
1
-
1
- 120º
1
+ 120º
1
- 30º
1.73
- 90º
1.73
+150º
1.73
Application manual