Installation Qualification Verification - PerkinElmer FX-10 UHPLC Manual

Liquid chromatograph flexar analytical
Table of Contents

Advertisement

1.3.9
PC's requirements are met with reference to the appropriate section in the user's
guide.
1.3.10
Instrument is identified, connected and set up in accordance with reference to the
appropriate instructions in the user's guide.
1.3.11
Adequate electricity supply available and unit is grounded
1.3.12
Software installed on the PC with reference to the appropriate instructions in the
user's guide.
1.3.13
Necessary components/accessories installed with reference to the appropriate
instructions in the user's guide.
1.3.14
Firmware verification
1.3.15
Software installed and appropriate panels displayed:
1.3.16
Instrument control software installed if applicable
1.3.17
Data Acquisition Software installed
1.3.18
Operating System (name and version)
1.3.19
Other Software installed if applicable (name and version)
1.3.20
Start-up diagnostics run to completion (instrument initialized)
1.3.21
Warranty and available services explained
1.3.22
System Familiarization and Orientation Completed
1.3.23
List Attendees:
1.4

Installation Qualification Verification

The Flexar Analytical / FX-10 UHPLC Pump, Serial Number Template-SN, has been
properly set up and installed, and all appropriate forms and documents supporting the
system have been filled out and are available.
Comments:
PerkinElmer LAS Representative:
Reviewed By:
Flexar Analytical / FX-10 UHPLC Pumps IQ/OQ Rev. D June 2009
Verified:
Date:
Date: