Turning On The Terminal; 3350Se Power Management Button - Wyse Winterm 3200LE Administrator's Manual

3000 series
Hide thumbs Also See for Winterm 3200LE:
Table of Contents

Advertisement

24
Terminal Installation

Turning On the Terminal

Once the terminal is installed and all back panel connections have been made,
press and release the power management button (see the following figure) to
power-up the terminal.
Figure 3-3 3350SE Power Management Button
The logo will appear on the screen followed by:
The Setup Wizard, if it is the first time that you have powered-up your terminal.
The Winterm Connection Manager dialog box, if the Setup Wizard has been
completed.
If desired, adjust the display's geometry and intensities to your preferences.
Adjustments to the display can be made at any time, whether or not the terminal is
connected to a server.
Power
Management
Button

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents