HP A5500 SI Switch Series Configuration Manual page 398

Hide thumbs Also See for A5500 SI Switch Series:
Table of Contents

Advertisement

[SwitchB] interface vlan-interface 200
[SwitchB-Vlan-interface200] pim ipv6 sm
[SwitchB-Vlan-interface200] quit
[SwitchB] interface vlan-interface 101
[SwitchB-Vlan-interface101] pim ipv6 sm
[SwitchB-Vlan-interface101] quit
[SwitchB] interface vlan-interface 102
[SwitchB-Vlan-interface102] pim ipv6 sm
[SwitchB-Vlan-interface102] quit
[SwitchB] interface vlan-interface 103
[SwitchB-Vlan-interface103] pim ipv6 sm
[SwitchB-Vlan-interface103] quit
The configuration on Switch C, Switch D, Switch F, Switch G, and Switch H is similar to the
configuration on Switch B. The specific configuration steps are omitted here.
Configure an admin-scope zone boundary.
3.
# On Switch B, configure VLAN-interface 102 and VLAN-interface 103 to be the boundary of admin-
scope zone 1.
[SwitchB] interface vlan-interface 102
[SwitchB-Vlan-interface102] multicast ipv6 boundary scope 4
[SwitchB-Vlan-interface102] quit
[SwitchB] interface vlan-interface 103
[SwitchB-Vlan-interface103] multicast ipv6 boundary scope 4
[SwitchB-Vlan-interface103] quit
# On Switch C, configure VLAN-interface 103 and VLAN-interface 106 to be the boundary of admin-
scope zone 2.
<SwitchC> system-view
[SwitchC] interface vlan-interface 103
[SwitchC-Vlan-interface103] multicast ipv6 boundary scope 4
[SwitchC-Vlan-interface103] quit
[SwitchC] interface vlan-interface 106
[SwitchC-Vlan-interface106] multicast ipv6 boundary scope 4
[SwitchC-Vlan-interface106] quit
# On Switch D, configure VLAN-interface 107 to be the boundary of admin-scope zone 2.
<SwitchD> system-view
[SwitchD] interface vlan-interface 107
[SwitchD-Vlan-interface107] multicast ipv6 boundary scope 4
[SwitchD-Vlan-interface107] quit
Configure C-BSRs and C-RPs.
4.
# On Switch B, configure the service scope of RP advertisements and configure VLAN-interface 101 as a
C-BSR and C-RP of admin-scope zone 1.
[SwitchB] pim ipv6
[SwitchB-pim6] c-bsr scope 4
[SwitchB-pim6] c-bsr 1002::2
[SwitchB-pim6] c-rp 1002::2 scope 4
[SwitchB-pim6] quit
386

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

A5500 ei switch series

Table of Contents