Package Contents; Figure 4-1. Handle Locations - Advanced Energy AE 3TL 600 Series Installation And Operation Manual

Table of Contents

Advertisement

Central handle
Figure 4‑1. Handle locations
2. Carefully open the box.
3. Use the central handles on each side of the inverter to lift the inverter from the
box.
The cardboard flap remains attached to the inverter housing and can be used to
protect the unit when it is placed on the floor to prevent damage to the lid.
Save the shipping container in case in the future the inverter needs to be moved
in to a new location or returned for service.

Package Contents

  
The following items are included with the inverter when it is packaged for shipping:
• Wall mount bracket with Phillips screws and M8 washers to secure the bracket
to the wall
• Connector parts:
◦ Two 4-pin RS-485 connectors
◦ One 5-pin connector for irradiation sensor
570-1003552-05A
Advanced Energy® AE 3TL Inverters
Upper handle
Central handle
Lower handle
Installing
4‑3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 3tl 1000 series

Table of Contents