  WARNING:
Do not attempt to turn on power until the AE 3TL unit is grounded.
  AVERTISSEMENT:
Ne pas mettre l'appareil AE 3TL en marche s'il n'a pas été mis à la terre.
To Start Up the AE 3TL Inverter
1. Verify the connection box cover is secure.
2. Close the AC system circuit breakers or insert the external main fuse.
3. Turn the DC disconnect to the ON position.
If the solar modules are receiving sufficient sunlight and no fault exists, the
following sequence will occur:
◦ Self test: All status LEDs light up indicating system initialization. This
process takes approximately five minutes.
◦ System check: After the self test completes, the Ready LED flashes
indicating the UL-required five minute system check. The display is lit with
the following information:
4. Verify that the initialization procedure is complete by checking the following:
◦ Status LED READY is continuously lit.
◦ The display begins providing data.
The inverter electronics, the control panel, display, and operating buttons, are
active when DC voltage is applied since they are supplied exclusively from the
DC input.
5. Verify that the startup procedure has started by checking the following:
5‑4
 Important
On first time startup, this process may take as long as an hour.
READY
ON
ALARM
EARTH FLT
PAC
0 W
UAC
0.0 V
UDC
0 V
y day
0.0 kWh
Initializing
F1 - Menu
F1
ESC
Operating