Start-Up Operations - Rheavendors Group XS Instant Installation And Maintenance Manual

Vending machine
Table of Contents

Advertisement

11 Start-up operations

11.1 First installation phase
During the First installation phase water is filled inside the boiler. Then it is necessary to set the correct
boiler's temperature.
11.1.1 Loading the boiler
Make sure that the liquid waste bucket is correctly placed.
Version R - Open the tap of the water circuit.
Version A – Fill the blue water tank.
Open the front door.
Insert the plastic key into the safety switch and turn on the machine.
The machine starts to make automatically the First Installations operations.
The display shows:
water refilling
The machine starts automatically loading the boiler with water. The boiler is filled up in about 3 min. At
the end of this phase the machine starts to test the Damian Snack as described at the paragraph
"Diagnostics cycle of the switching up".
To check if the load is sufficient, switch off and on the machine press button 8 when the display shows:
cleaning
sel. 8
and check if the machine makes correct cleanings.
11.1.2 Modification of the operating temperature
To modify the temperature threshold, after loading water inside the boiler
the safety switch and wait until the display shows
rheavendors
XS I
Place
Your cup
Press the key inside the machine on the display board.
The display will flash the messages:
MAN1100105 V. 9 – 09/11/2011
18
, insert the plastic key into

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents