Installing The Boom Assembly - Toro 41235 Operator's Manual

Spray system heavy-duty vehicles
Table of Contents

Advertisement

4. Install the Spray Pro Decal to the monitor (Figure 25).
Figure 25
1. Spray pro monitor
2. Decal, Upper half
Note: Be sure to orient the decal as shown in
Figure 38.
5. Connect the tank skid wiring harness to the spray
system power connector.
6. Install two J-clips in the center console at the points
located in Figure 26 using the existing screws.
Figure 26
1. J-clip
2. Existing screws
7. Install a J-clip in the ROPS cover behind the operator
using a bolt (1/4 x 1 inch) and a nut (1/4 inch). The
hole is on the centerline, approximately 20 inches in
from the operator's side edge of the ROPS cover.
Note: If a hole is not present, one must be drilled.
Drill a 1/4 inch hole in the top surface of the cover on
the centerline approximately 20 inches from the edge
on the operator's side (Figure 27).
3. Decal, Lower half
3. Control box harness
4. Center console
1
G011762
1. Drill hole (1/4 inch)
8. Secure the control box harness to the console and
ROPS cover using the J-clips.
11

Installing the Boom Assembly

Parts needed for this procedure:
1
Center boom assembly
10
Bolt (3/8 x 1-1/4 inches)
10
Lock nut (3/8 inch)
2
Boom transport cradle
4
Bolt (1/2 x 1-1/4 inches)
4
Flange nut (1/2 inch)
1
Left boom extension
1
Right boom extension
Procedure
1. Locate and remove the center boom assembly from
packaging.
2. Install the boom transport cradles to the center boom
using 6 bolts (3/8 x 1-1/4 inches) and 6 lock nuts (3/8
inch). Orient them as shown in Figure 28.
21
2
Figure 27
2. 20 inches

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman 200

Table of Contents