Toro 41235 Operator's Manual page 41

Spray system heavy-duty vehicles
Table of Contents

Advertisement

1
Figure 50
1. Actuator
2. Actuator rod
3. Boom pivot pin housing
3. Lift up on the boom and remove the pin (Figure 50).
Slowly lower the boom to the hardstop.
4. Inspect the pin for any damage, replace if necessary.
5. Manipulate the actuator rod bearing end and apply
grease into the bearing (Figure 51). Wipe off excess
grease.
Figure 51
Right boom
1. Grease bearing
6. Lift up on the boom to align the pivot with the actuator
rod. While holding the boom, insert the pin through
both boom pivot and actuator rod (Figure 50).
7. With the pin in place, release the boom and secure the
pin with the cotter removed previously.
4
2
5
3
G002016
4. Cotter
5. Pin
8. Repeat the procedure for each actuator rod bearing.
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman 200

Table of Contents