Toro 41235 Operator's Manual page 39

Spray system heavy-duty vehicles
Table of Contents

Advertisement

Figure 45
Left side shown
1. Front mounting bracket
2. Hold-down bracket
3. Bolt (1/2 x 1-1/2 inches)
4. Fold the boom extensions forward, alongside the tank
assembly to distribute the weight more evenly and keep
it from tipping back.
5. Raise the tank assembly until the lift cylinders are fully
extended.
6. Remove the bed support from the storage brackets on
back of the ROPS panel (Figure 46).
Figure 46
1. Bed support
7. Push the bed support onto the cylinder rod, making
sure the support end tabs rest on the end of cylinder
barrel and on the cylinder rod end (Figure 47).
4. Washer (1/2 inch)
5. Locknut (1/2 inch)
1. Bed support
2. Cylinder barrel
Lowering the Tank Assembly
1. When finished, remove the bed support from the
cylinder and insert it into the brackets on the back of
the ROPS panel.
CAUTION
Do not try to lower the tank assembly with
bed safety support on cylinder.
2. Retract the lift cylinders to carefully lower the tank to
the frame.
3. Install the two hold down bolts and fasteners to secure
the tank assembly
4. Fold the boom extensions rearward to the extended
position.
5. Use the boom control switches to raise the boom
extensions to the transport position.
39
Figure 47
3. Bed

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman 200

Table of Contents