Installing The Power Take-Off (Pto) Kit(For Workman ® 3000, 4000 Series Only); Installing The Electrical Harness - Toro 41235 Operator's Manual

Spray system heavy-duty vehicles
Table of Contents

Advertisement

1. Cover
2. Screw (M6 x 1.00 x 12)
3. Spring washer (M6)
5. Install the geartooth sensor using the screw (M6 x 1.00
x 12) and spring washer (M6) as shown in Figure 6.
6. Install the muffler bracket over the new cover assembly.
4
Installing the Power
Take-Off (PTO) Kit
(for Workman
series only)
No Parts Required
Procedure
Suspend the setup of the Workman 200 Spray System at
this time to install the PTO kit. Refer to the accompanying
Installation Instructions for more information.
Continue to the next step once completed.
Figure 6
4. Geartooth sensor
5. Seal
6. Forward face
®
3000, 4000
5
Installing the Electrical
Harness
Parts needed for this procedure:
1
Fuse block
1
Fuse (10 amp)
2
Thermal breaker (30 amp)
1
Hex screw (#10-24 x 3/4 inch)
1
Phillips screw (#10-24 x 3/4 inch)
2
Locknut (#10-24)
1
Wire harness
1
Jumper harness (HD series only)
1
Star washer
8
Wire tires
1
Fuse decal
for Workman
®
1. Remove the screws holding the front hood to the
frame. Disconnect the wiring harness attached to the
headlights. Remove the hood to access the electrical
wiring.
2. Locate the electrical wire harness and fuse block in
loose parts.
3. Remove the two screws from the existing fuse block
and slide the new fuse block into the grooves of the
existing block.
4. Wire the electrical harness to the fuse block by joining
the wires in the harness to the corresponding wire
connectors in the back of the fuse block (Figure 7).
13
3000, 4000 series

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman 200

Table of Contents