Finishing The Test; Care Of The Equipment - Aston Martin DB7 Workshop Manual

Table of Contents

Advertisement

r^ '
^ ^
The Aston Martin Lagonda Diagnostic System
Installation Instructions
Finishing the Test
When data analysis is finished, switch off the PDU
and disconnect it from the vehicle. Store the PDU
and cables in the carrying case and refit the case to
the base station.
Connect the PDU to the base station using cable
0064. The base station will keep the PDU batteries
fully charged at all times (Fig 15).
Figure 15. PDU connected for recharging
Care of the Equipment
CAUTION:
With the exception of those parts
referred to in the Servicing and Maintenance
section, there are no user serviceable parts. All
servicing must be carried out by GenRad Service
Centres.
Switch offthe power before cleaningtheequipment.
The Aston Martin Diagnostic System should only
be cleaned using a non-abrasive, mild cleaning
agent. Dust and other particles should be lightly
brushed from the surface before cleaning. Cleaning
agent should be applied to a soft lint-free cleaning
cloth and never directly to the unit. Do not soak the
cleaning cloth and take care not to allow cleaning
fluid to enter connectors.
CAUTION:
Ifany liquid is spilt on theequipment,
switch off immediately. Ensure that the equipment
has dried out completely before operating it again,
especially in connectors where fluid can lodge.
May 1996
9-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents