RIG
GING
2
4. Connect the gauge harness 6 to the
coupler b. (R model)
6
5. Route the battery cable 7, 10-pin main
wiring harness 8, and gauge harness 6
(R model) into the grommet 9. Then fas-
ten the battery cable with the plastic tie
0 (H model).
å
7
8
9
3-13
Rigging information
a
b
∫
6
7
8
9
å
4
1
8
3
5
å H model
∫ R model
Control cable installation
Installing the shift cable (rod) and
throttle cable
1. Install the grommet 1 onto the shift
cable (rod) 2 and throttle cable 3, and
install the cable guide 4 to the groove of
the shift cable 2 (R model) and throttle
cable 3. Then install them to the bottom
cowling.
å
9
1
2
3
7
0
4