Log Installation - kozy heat Jackson XL Installation And Operation Manual

Direct vent insert
Hide thumbs Also See for Jackson XL:
Table of Contents

Advertisement

J) LOG INSTALLATION. See Figures J-1 - J-3.
This log set includes:
NOTE: THE 'BI' LOG IS NOTCHED AND SHOULD BE POSITIONED ONTO THE BURNER COVER PLACING THE
NOTCHED OUT SECTIONS IN THE LOG TO THE BRACKETS IN THE CENTER OF THE BURNER COVER.
1.
Position the base logs onto burner cover in the following order: X1, X2,
X3 & X4. Align the mounting holes in the bottom of the logs to the corre-
sponding mounting studs. Pull X1 log forward toward burner tube. Figure
J-1.
2.
Place klinkers behind the log grate in the front of the burner cover as
shown in Figure J-1. Do not place klinkers behind the 2nd & 3rd grate
extensions. The X7 & X9 logs when properly installed, set on the burner
cover, not on klinkers.
3.
Brush Rock wool embers onto burner and base logs with a stiff bristle
brush.
NOTE:
You will not use all the embers included in the packet at this
time. Save for future use.
4.
Position X6, X7, & X8 logs onto the alignment cut-outs on the base logs.
Refer to Figure J-2.
5.
Position top logs X9 & X10onto the alignment cut-outs on the base and
middle logs as shown in Figure J-3.
6.
Brush additional Rockwool embers onto logs.
INITIAL BURN PERIOD
DUE TO THE MAKEUP OF THE REFRACTORY, THE CURING PROCESS MAY
TAKE UP TO 4 HOURS OF BURN TIME. DURING THIS PERIOD, THEY WILL
SLIGHTLY DISCOLOR. ONCE THE CURING PROCESS IS COMPLETE, THE
TRUE COLOR WILL RETURN. DO NOT BURN THIS FIREPLACE WITHOUT THE
GLASS PROPERLY IN PLACE.
**MAKE SURE THE HOMEOWNER IS AWARE OF THIS**
(1) X1 log
(1) X4 log
(1) X2 log
(1) X6 log
(1) X3 log
(1) Rock Wool Embers Pkg.
(1) X7 log
(1) X9 log
(1) X8 log
(1) X10 log
(1) Klinker pkg.
X3
X6
X9
PAGE 19
X1
X2
Figure J-1
X7
X8
Figure J-2
X10
Figure J-3
X4

Advertisement

Table of Contents
loading

Table of Contents