Download Print this page

Raccordements Électriques; Electrical Connections - Beretta POWER PLUS 50 M Installation Instruction

Hide thumbs Also See for POWER PLUS 50 M:

Advertisement

ENGLISH
EN

Electrical connections

The POWER PLUS 50 M, 100 M and 100 M DEP boilers leave the
factory completely wired, with the power cable already connected,
and only require the connection of the room thermostats, the out-
side probe and the pumps used, to the corresponding terminals.
Only the Bus cable and the pump need to be connected, see the
wiring diagram.
To do this:
- Move the main system switch to "off";
- Unscrew the fastening screws (1) on the front
panel (2);
- Pull the base of the panel (2) outwards and then
upwards to release it from the frame and then
remove it;
- Turn the control panel (3) and remove
the rear cover, taking out the locking
screws (4).
- Identify the terminal block (5) and make
the connections, as in the diagram
shown below.
Raccordements électriques
Les chaudières POWER PLUS 50 M, 100 M et 100 M DEP quittent
l'usine entièrement câblés, avec le câble d'alimentation électrique
déjà raccordé, et ne nécessitent que le raccordement des thermo-
stats d'ambiance, de la sonde extérieure et des circulateurs utilisés,
à effectuer sur les bornes dédiées.
2
1
Pour ce faire :
- Mettre l'interrupteur général de l'installation sur
« arrêt ».
- Dévisser les vis (1) de fixation du panneau frontal
(2).
- Tirer vers soi puis vers le haut la base du pan-
neau (2) pour décrocher ce dernier du châssis
et le retirer.
- Tourner le tableau de commande (3) et
retirer le panneau arrière en enlevant
les vis de fixation (4).
- Identifier le bornier (5) et effectuer les
raccordements comme indiqué sur le
schéma ci-dessous.
FRANÇAIS
FR
33

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Power plus 100 sPower plus 100 m dep