Installing Roof Assembly - Porsche 2015 911 GT3 Cup Technical Manual

Table of Contents

Advertisement

4.17

Installing roof assembly

Preparation measure
NOTE
A drying time of at least 10 minutes must be observed between cleaning the frame
and applying primer! No cleaning solution residue may remain on the frame.
The adhesive has an open time of 15 min, which means that the adhesive
must be applied and the component affixed within this period of time.
To ensure that the substance is completely mixed, apply a 30 mm long
bead of fresh adhesive to a piece of cardboard before processing.
Version: 16.12.2014
Danger of material damage if specified curing time of
adhesive is not observed! In order to ensure that the
bonded joint is sufficiently strong, the following
conditions must be adhered to:
The vehicle must not be used until the curing
time has
Curing time: 2 hours
Temperature: at least 10 °C (50 °F)
Fixing time: approx. 1 hour
Bodywork
4.17.1
911 GT3 Cup (991)
MY 2015
245

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2016 911 gt3 cup 9912016 911 gt3 cup

Table of Contents