Download Print this page

Carf-Models BAE Hawk MK 66 Instruction Manual page 19

Hide thumbs Also See for BAE Hawk MK 66:

Advertisement

Turbine and Trust Tube
Start by locating the 4 3mm milled
plywood
pieces.
The two lower ones, which later
contact the duct surface, need to be
rounded as you see here. Trial fit until
they sit flat on the duct mount
surface.
Roughen the gluing area and glue the
wood parts with 30 min epoxy on the
carbon ducting. Make sure they sit flush
and are aligned to each other.

Advertisement

loading