Inspire SCS-202 Assembly And Operation Manual page 20

Table of Contents

Advertisement

Step 17
1 - Upper Cable
1 - 3 ½" Dia. Pulley
1 - M10 x 70 Hex Bolt
2 - 1/2" Step Spacers
1 - M10 Locknut
Floating Pulley Assy. with
Guide Bushing
Cable End detail
1 - Plastic Ball
1 - "U" Bracket
1 - Spring Clip
1 - M6 x 20 Button Head Bolt
1 - M6 Flat Head Nut
Step 17: Install the Upper Cable on the right side of the machine. Repeat the installation sequence in
Step 16, but this time on the right side of the machine using:
One (Upper Cable)
One (3 ½" Dia. Pulley)
One (M10 x 70 Hex Bolt)
Two (1/2" Step Spacers)
One (M10 Locknut)
(Wrench Tighten Now)
Pulleys #5 and #6
Pulleys #8 and #9
Pulley #11
Floating Pulley Assy.
Pulley #10
Cable Column
Slider Assy.
One (Plastic Ball)
One ("U" Bracket)
One (Spring Clip)
One (M6 x 20 Button Head Bolt)
One (M6 Flat Head Nut)
Page 17
Cable End
Cable inside tube
Pulley #3
Pulley #4
Pulley #7
Pulley #2
Pulley #1
Start cable here

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents