Toro Groundsmaster 360 Service Manual page 297

Hide thumbs Also See for Groundsmaster 360:
Table of Contents

Advertisement

6. Disconnect end yoke of PTO drive shaft from cutting
deck gearbox shaft (see PTO Drive Shaft Removal in
the Service and Repairs section of Chapter 6 -- Chas-
sis). Position and support drive shaft end away from
deck gearbox.
7. Remove four (4) ring pins and clevis pins that secure
deck lift chains to adjustment clevises on cutting deck
(Fig. 1).
8. Slide cutting deck away from machine.
Deck Installation
1. Slide cutting deck under carrier frame of machine.
2. Install four (4) clevis pins and ring pins to secure deck
lift chains to adjustment clevises on cutting deck (Fig. 1).
3. Connect end yoke of PTO drive shaft to cutting deck
gearbox shaft (see PTO Drive Shaft Installation in the
Service and Repairs section of Chapter 6 -- Chassis).
Groundsmaster 360
4. Start engine and fully raise cutting deck. Stop engine
and remove key from the ignition switch.
Be careful when connecting the pull links to the
machine. The pull link torsion springs may cause
some rotation of pull links during installation.
5. Align pull link to carrier frame and attach link with re-
tainer pin. Secure retainer pin to frame with shoulder
screw (Fig. 1).
6. Install HOC pin into HOC bracket to allow desired
height--of--cut (Fig. 2).
7. Connect the wire harness electrical connector to the
PTO solenoid valve coil connector (Fig. 3).
Page 7 - - 7
CAUTION
Cutting Deck

Advertisement

Table of Contents
loading

Table of Contents