Unpacking

Open the shipping carton of the Switch and carefully unpack its contents. The carton should
contain the following items:
One switch chassis
One management module (pre-installed in uppermost slot)
One power supply module (pre-installed)
One mounting kit: four mounting brackets and screws
Four rubber feet with adhesive backing
One AC power cord
One console cable
One printed copy of the Quickstart Guide
One CD-ROM containing this User's Guide
If any item is found missing or damaged, please contact your local reseller for replacement.

Setup

The setup of the Switch can be performed using the following steps:
The surface must support at least 5 kg.
The power outlet should be within 1.82 meters (6 feet) of the device.
Visually inspect the power cord and see that it is secured fully to the AC power
connector.
Make sure that there is proper heat dissipation from and adequate ventilation
around the Switch. Do not place heavy objects on the Switch.

Desktop or Shelf Installation

When installing the Switch on a desktop or shelf, the rubber feet included with the device must
be first attached. Attach these cushioning feet on the bottom at each corner of the device. Allow
enough ventilation space between the device and the objects around it.