Processors
11.1
Basic procedure
I
Depending on your server model different processores are supported,
see
"Model lines for TX140 S1" on page 27
11.2
Upgrading or replacing the processor
Field Replaceable Units (FRU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes
V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.2.1 Required tools
Preliminary and concluding steps: tool-less
●
Removing and installing the processor heat sink:
●
– Phillips PH2 / (+) No. 2 screw driver
Removing and installing the processor: tool-less
●
11.2.2 Preliminary steps
Before upgrading or replacing the processor, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
308
93.
Upgrade and Maintenance Manual
.
"Disabling BitLocker
TX140 S1