1 Remove the power cord. Remove
the fuse holder assembly from the rear
3 Rotate the line-voltage selector until
the correct voltage appears in the window.
100, 120, 220 (230), or 240 Vac
Install the correct fuse and verify that the correct line voltage appears in the window.
Chapter 1 Quick Start
If the Meter Does Not Turn On
2 Install the fuse. Remove the
line-voltage selector from the assembly.
250 mAT fuse
(250V)
4 Replace the fuse-holder assembly in the
rear panel.
1
15