Outline Of Host Link/Nt Link Operation; Equipment And Settings Used In This Chapter - Omron NT11 - 01-2004 User Manual

Programmable terminal
Hide thumbs Also See for NT11 - 01-2004:
Table of Contents

Advertisement

Outline of Host Link/NT Link Operation

!Caution Carefully check the operation of all screen data and host programs before
5-2

Outline of Host Link/NT Link Operation

5-2-1

Equipment and Settings Used in This Chapter

Setting the Clock Data Area
Set the address of the first word to allocate as the Clock
Data Area in the host so that the clock data can be read
from the host.
Creating and Correcting a Screen
After designating a screen, set the screen properties and
register elements for the screen or correct the screen. If
necessary, create marks, image data, and library data, and
set the initial values of memory table entries.For details of
screens and elements, refer to
Saving a File
Save the created screen data to a file.
Transmitting the Screen Data
Transmit the created screen data to the PT. After
setting the PT in the Transmit mode, execute the
screen data transmission operation with the Support
Tool.
NT11
[Transmit Mode]
using them. Otherwise the system may operate unpredictably.
This section describes the basics for operating the NT11 through communica-
tions with the PLC using the host link/NT link.
The following equipment and settings are used in the examples in this Chap-
ter:
[Equipment] PT:
(NT21 only)
SECTION 4 NT11 Functions.
Support Tool
NT11-SF121-EV1
Section 5-2
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents