Agilent Technologies 1260 Infinity VL User Manual page 43

Quaternary pump
Table of Contents

Advertisement

When priming the vacuum degasser with a syringe, the solvent is drawn through the
N O T E
degasser tubes very quickly. The solvent at the degasser outlet will therefore not be fully
degassed. Pump for approximately 10 minutes at your desired flow rate before starting an
analysis. This will allow the vacuum degasser to properly degas the solvent in the degasser
tubes.
1 Open the purge valve of the pump
2 Set the flow rate to 5 mL/min.
3 Select channel A.
4 Turn the flow on
5 Observe if the solvent in the tubing of channel A is advancing towards the
6 Pump 30 mL isopropanol to remove residual air bubbles.
7 Switch to the next solvent channel and repeat steps 5 and 6 until all
8 Turn the flow off and close the purge valve.
1260 Infinity QuatPump VL User Manual
pump. If not, disconnect the solvent tubing from the MCGV, attach a syringe
with a syringe adapter and pull the liquid through the degasser. Reattach
the tubing to the MCGV.
channels have been purged.
Installing the Pump
Priming the System
3
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

G1311c

Table of Contents