Agilent Technologies 1260 Infinity VL User Manual page 40

Quaternary pump
Table of Contents

Advertisement

3
Installing the Pump
Flow Connections of the Pump
1 Remove the front cover by pressing the snap fasteners on both sides.
2 Place the solvent cabinet on top of the quaternary pump.
3 Put the bottle-head assemblies into empty solvent reservoirs and place the
4 Connect the inlet tubes from the bottle-head assemblies to the inlet
5 Connect the solvent tubes from the MCGV inlet to the outlets of the vacuum
6 Using a piece of sanding paper connect the waste tubing to the purge valve
7 If the pump is not part of an Agilent 1260 Infinity system stack or placed on
8 Connect the pump outlet capillary (pump to injection device) to the outlet
9 Fill solvent reservoirs with your mobile phase.
40
Figure 7
Removing the Front Corver
bottle in the solvent cabinet.
connectors A to D at the right hand side of the vacuum degasser, see
Figure 8
on page 41. Fix the tubes in the tube clips of the pump.
degasser.
and place it into your waste system.
the bottom of a stack, connect the waste tube to the waste outlet of the
pump leak handling system.
of the purge valve.
1260 Infinity QuatPump VL User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

G1311c

Table of Contents