Quaternary pump
Table of Contents

Advertisement

3
Installing the Pump
Installing the Pump
4 Connect the required interface cables to the quaternary pump, see
5 Connect all capillaries, solvent tubes and waste tubing (see
6 Press the power switch to turn on the module.
The power switch stays pressed in and a green indicator lamp in the power switch is on
N O T E
when the module is turned on. When the line power switch stands out and the green light
is off, the module is turned off.
7 Purge the quaternary pump (see
The pump was shipped with default configuration settings. To change these settings, see
N O T E
"Setting the 8-bit Configuration Switch (without On-board) LAN"
36
"Connecting Modules and Control Software"
Connections of the Pump"
on page 37.
on page 39).
"Inital Priming"
1260 Infinity QuatPump VL User Manual
"Flow
on page 42).