ZyXEL Communications XMG1915 Series User Manual page 33

8-16-port multi-gigabit smart managed switch
Table of Contents

Advertisement

Do the following to attach your Switch to a wall.
Select a position free of obstructions on a wall strong enough to hold the weight of the Switch.
1
Mark two holes on the wall at the appropriate distance apart for the screws.
2
WARNING! Be careful to avoid damaging pipes or cables located inside
the wall when drilling holes for the screws.
If using screw anchors, drill two holes for the screw anchors into the wall. Push the anchors into the full
3
depth of the holes, then insert the screws into the anchors. Do NOT insert the screws all the way in –
leave a small gap of about 0.5 cm.
If not using screw anchors, use a screwdriver to insert the screws into the wall. Do NOT insert the screws
all the way in – leave a gap of about 0.5 cm.
Make sure the screws are fastened well enough to hold the weight of the Switch with the connection
4
cables.
Align the holes on the back of the Switch with the screws on the wall. Hang the Switch on the screws.
5
Note: Make sure there is enough clearance between the wall and the Switch to allow
ventilation.
Chapter 2 Hardware Installation and Connection
XMG1915 Series User's Guide
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xmg1915-10ep

Table of Contents