IBM BladeCenter JS22 Problem Determination And Service Manual page 127

Table of Contents

Advertisement

Table 18. CA000000 to CA2799FF checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
CA00D008
CA00D00C
CA00D00D
CA00D010
CA00D011
CA00D012
CA00D013
CA00D020
Description
Initialize console and flush queues
The partition firmware is about to
search for an NVRAM script
Evaluating NVRAM script
First pass open firmware initialization
complete; establish parameters for
restart
First pass open firmware initialization
complete; control returned to
initialization firmware
Second pass open firmware initialization
complete; control returned to
initialization firmware
Runtime open firmware initialization
complete; control returned to
initialization firmware
About to download the run the SLIC
loader (IOP-less boot)
Action
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
Chapter 2. Diagnostics
113

Advertisement

Table of Contents
loading

This manual is also suitable for:

7998

Table of Contents