IBM BladeCenter JS22 Problem Determination And Service Manual page 115

Table of Contents

Advertisement

Table 16. C2001000 to C20082FF checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
C20012FF
C2001300
C20013FF
C2001400
C2001410
C20014FF
C2002100
Description
Partition startup is allowed to proceed
Initializing ISL roadmap
ISL roadmap initialized successfully
Initializing SP
Communication Area #1 1. Go to "Recovering the system firmware" on
Initializing startup parameters
Startup parameters initialized
successfully
Power on racks
Action
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Recovering the system firmware" on
page 222.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
Chapter 2. Diagnostics
101

Advertisement

Table of Contents
loading

This manual is also suitable for:

7998

Table of Contents