IBM BladeCenter JS22 Problem Determination And Service Manual page 112

Table of Contents

Advertisement

Table 15. C1001F00 to C1645300 checkpoints (continued)
v If the system hangs on a progress code, follow the suggested actions in the order in which they are listed in
the Action column until the problem is solved. If an action solves the problem, you can stop performing the
remaining actions.
v See Chapter 3, "Parts listing, Type 7998," on page 235 to determine which components are CRUs and which
components are FRUs.
Progress code
C1009xC4
C1009xC8
C1009xCC
C1009xD0
C1009xD4
C103A1xx
C103A2xx
C103A3xx
98
JS22 Type 7998: Problem Determination and Service Guide
Description
Dump initialization step in progress
Start PRD step in progress
Message passing waiting period has
begun
Message passing waiting period has
begun
Starting elastic interface calibration
Hypervisor code modules are being
transferred to system storage
Hypervisor data areas are being built in
system storage
Hypervisor data structures are being
transferred to system storage
Action
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.
1. Go to "Checkout procedure" on page 186.
2. Replace the system-board and chassis
assembly, as described in "Replacing the
Tier 2 system-board and chassis assembly"
on page 270.

Advertisement

Table of Contents
loading

This manual is also suitable for:

7998

Table of Contents