Precautions When Mounting The Outdoor Unit; To Provide The Installation Structure - Daikin EAVH16S23DA6V Installer's Reference Manual

Hide thumbs Also See for EAVH16S23DA6V:
Table of Contents

Advertisement

7
|
Unit installation

7.3.2 Precautions when mounting the outdoor unit

7.3.3 To provide the installation structure

Installer reference guide
66
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
3
Providing drainage.
4
Preventing the unit from falling over.
5
Protecting the unit against snow and wind by installing a snow cover and baffle
plates. See
"7.1 Preparing the installation
INFORMATION
Also read the precautions and requirements in the following chapters:
General safety precautions
Preparation
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 6 sets of anchor bolts, nuts and washers (field supply) as follows:
(mm)
a Make sure not to cover the drain holes.
In any case, make sure the unit is positioned at least 100 mm above the maximum
expected level of snow.
site" [
6× M12
a
EPGA11~16DAV3(7) + EAVH/X16S18+23DA6V(7)+9W(7)
4
 56].
Daikin Altherma 3 H F
4P556070-1A – 2021.09

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents