Unit installation

7.2.8 To close the indoor unit

7.3 Mounting the outdoor unit

7.3.1 About mounting the outdoor unit

7.3.2 Precautions when mounting the outdoor unit

7.3.3 To provide the installation structure

Installer reference guide
76
1 Reconnect the ground connection to the top cover of the switch box.
2 Close the cover of the switch box.
3 Reinstall the top cover.
4 Check that the top cover is correctly fitted.
5 Screw in the top cover screws to secure it.
6 Put the switch box back into place.
7 Reinstall the user interface panel.
NOTICE
When closing the indoor unit, make sure that the tightening torque does NOT exceed
4.1 N•m.
When
You have to mount the outdoor unit before you can connect the water piping.
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
3
Providing drainage.
4
Installing the discharge grille.
5
Protecting the unit against snow and wind by installing a snow cover and baffle
plates. See
"7.1 Preparing the installation
INFORMATION
Also read the precautions and requirements in the following chapters:
"2 General safety
"7.1 Preparing the installation
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
4
site" [
4
precautions" [
 10]
4
site" [
 66]
 66].
EPRA08~12EAV3+W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1B – 2022.07