Daikin EAVH16S23DA6V Installer's Reference Manual page 177

Hide thumbs Also See for EAVH16S23DA6V:
Table of Contents

Advertisement

To perform an underfloor heating screed dryout
To read out the status of an underfloor heating screed dryout
To stop an underfloor heating (UFH) screed dryout
EPGA11~16DAV3(7) + EAVH/X16S18+23DA6V(7)+9W(7)
Daikin Altherma 3 H F
4P556070-1A – 2021.09
3 Program the schedule:
To add a new step, select an empty line and change its value.
To delete a step and all steps below it, decrease the duration to
"–".
Scroll through the schedule.
Adjust the duration (between 1 and 72 hours) and
temperatures (between 15°C and 55°C).
4 Press the left dial to save the schedule.
Conditions: An underfloor heating screed dryout schedule has been programmed.
See
"To program an underfloor heating screed dryout
Conditions: Make sure all operation is disabled. Go to [C]: Operation and turn off
Room, Space heating/cooling and Tank operation.
1 Set the user permission level to Installer. See
the user permission
2 Go to [A.4]: Commissioning > UFH screed dryout.
3 Select Start UFH screed dryout.
4 Select OK to confirm.
Result: The underfloor heating screed dryout starts. It stops
automatically when done.
5 To stop the underfloor heating screed dryout manually:
1 Open the menu and go to Stop UFH screed dryout.
2 Select OK to confirm.
Conditions: You are performing an underfloor heating screed dryout.
1 Press the back button.
Result: A graph is displayed, highlighting the current step of the
screed dryout schedule, the total remaining time, and the
current desired leaving water temperature.
2 Press the left dial to open the menu structure and to:
1 View the status of sensors and actuators.
2 Adjust the current program
U3-error
When the program is stopped by an error, an operation switch off, or a power
failure, the U3 error will be displayed on the user interface. To resolve the error
codes, see
"14.4 Solving problems based on error
Stop UFH screed dryout
To manually stop underfloor heating screed dryout:
4
level" [
 102].
11
Commissioning
|
4
schedule" [
 176].
"To change
4
codes" [
 194].
Installer reference guide
177