Installing The Shielding - Siemens FC2025 Manual

Fire alarm control panel marine application
Hide thumbs Also See for FC2025:
Table of Contents

Advertisement

FS20 Marine Fire Detection Control Panel

Installing the Shielding

15.3
If using shielded cables, the cable gland must be fitted.
1. Pull nut (1), sealing element (2) and contact sleeve (3) over cable.
2. Trim outer cable surrounding to the desired length.
3. Trim braid or shield film to the contact sleeve (X) length.
4. Slide nut (1), sealing element (2) and contact sleeve (3) to end of surround.
5. Place braid or shield film over contact sleeve (3). Cut off protruding material.
6. Guide the prepared cable into fitted bottom part of cable gland (4) until sealing
7. Screw nut (1) to bottom part such that the cable is firmly pressed in.
80
Siemens Industry, Inc.
Building Technologies Division
Installing the shielding
1
Nut
2
Sealing element
3
Contact sleeve
element (2) and contact sleeve (3) are flush in bottom part.
4
Bottom part of cable gland
5
Braid
X
Length of contact sleeve
A6V10519176_enUS_b

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fc2050Fc922Fc924

Table of Contents