1. Mount the back box.
2. Feed all laid mains cables into the enclosure.
3. Mount the components in the back box.
4. Install the optional components on the operating unit.
5. Install and wire the operating unit and the option module (optional) to the inner door.
6. Insert the batteries, and connect the battery wiring.
7. Connect the mains cable to the power supply.
8. Insert the inscription strips into the operating unit or the option module.
9. Close the inner doors and install the outer door.
10. Affix the installation plate to the outside of the fire control panel enclosure such that it is clearly
legible.
 The panel is ready for commissioning.
12. Add the installation number (no. :), and the date of commissioning (Date:) during
commissioning.
See also
Laying and connecting the mains cable [➙ 40]
Siemens Industry, Inc.
Building Technologies Division
Do not connect the batteries to the periphery board; at this point.
FS20 Marine Fire Detection Panel Control Panel
39
A6V10519176_enUS_b

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fc2050Fc922Fc924

Table of Contents