Scheduling Repeating Tasks - Palm Tungsten Tungsten E Handbook

Palm tungsten tungsten e: user guide
Hide thumbs Also See for Tungsten Tungsten E:
Table of Contents

Advertisement

Scheduling repeating tasks

The repeat function enables you to schedule tasks that recur at fixed intervals or
recur at regular intervals after a prior instance of the task has been completed.
To schedule a repeating fixed-interval task:
Select the task.
1.
Tap Details.
2.
Tap the Repeat pick list.
3.
Perform one of the following:
4.
– Select a fixed interval from the pick list and tap OK.
– Select Daily until. Use the date picker to select an end date and tap OK.
– Select Other to open the Change Repeat dialog box and go to step 5.
Tap Day, Week, Month, or Year to set how often the task repeats.
5.
Tap Fixed Schedule.
6.
On the Every line, enter a number that corresponds to how often you want the
7 .
task to repeat.
For example, if you select Month and enter 2, the task repeats every other
month.
To specify an end date for the repeating task, tap the End on pick list, and then
8.
tap Choose Date. Use the date picker to select an end date.
If you selected Week or Month, perform one of the following:
9.
– If you selected Week, tap on the day of the week to repeat the task on.
– If you selected Month, select the day of the week or day of the month to
repeat the task on.
Tap OK.
10.
After you schedule a repeating or continuous task, the Repeat icon
to the task in the Tasks list.
Changing task details
appears next
123

Advertisement

Table of Contents
loading

This manual is also suitable for:

P80880us - tungsten e - os 5.2.1 126 mhzTungsten e

Table of Contents