Cable and fiber installation
............................................................................................................................................................................................................................................................
Fibre channel fiber installation
CIT cable installation
Final operations
Planning
Description
This section provides information about the following:
•
•
•
Tools, test equipment and accessories
The tools, test equipment and accessories required in this section are located in
equipment, and accessories (p.
tools.
.Cabling checklist
This section briefly describes cabling information. For information regarding available
cable lengths and ordering comcodes, see ED8C871-10.
Table 3-1, "Cable requirements and options" (p. 3-3)
............................................................................................................................................................................................................................................................
3 - 2
Tools, test equipment and accessories
Mounting options
Cabling checklist.
I-2). Installers should have both metric and English unit
lists available cables.
Alcatel-Lucent 1665 DMX R9.0
365-372-304R9.0 Issue 2
Planning
3-66
3-67
3-70
Tools, test
July 2010