Physical Installation; Planning; Tool, Test Equipment And Accessories Required - Alcatel-Lucent 1665 Installation Manual

Data multiplexer
Hide thumbs Also See for 1665:
Table of Contents

Advertisement

Physical installation

............................................................................................................................................................................................................................................................

Planning

Description
This section provides information about the following:
Tools, test equipment and accessories
The tools, test equipment and accessories necessary to perform the procedures in this
section are listed in
Installers should have both metric and English unit tools.
Mounting options
The mounting brackets on the Alcatel-Lucent 1665 DMX high-capacity shelf are designed
to allow for mounting in the following:
Standard 23-inch wide network bay frames
The recommended network bay frames are the ED-8C500 and the ED-8C501 (rear
access only). See
bay mounting arrangements" (p. 2-7)
in a network bay frame.
Seismic 23-inch network bay frame
The ED-8C800-500 and ED-8C801-501 seismic network bay frames are designed for
use in all earthquake zones, and in general, do not require top support at the 7-foot
level. These frames meet Pacific Bell Equipment Framework Standard PBS-000-
102PT.
19-inch bay frames
23-inch wide EIA-Type bay frames
Alcatel-Lucent 1665 DMX added to the Alcatel-Lucent1675 LambdaUnite MSS configurations
In order for the Alcatel-Lucent 1665 DMX shelf to be placed in a NEBS-2000 Cabinet
frame combined with Alcatel-Lucent 1675 LambdaUnite MSS, mounting kit 848856514
is required. For a more complete view of mounting the Alcatel-Lucent 1665 DMX into the
Alcatel-Lucent 1675 LambdaUnite MSS Frame, see SIG-L-WW-161A, Alcatel-Lucent
1665 DMX added to the Alcatel-Lucent 1675 LambdaUnite MSS configurations.
............................................................................................................................................................................................................................................................
2 - 2
Tools, test equipment and accessories
Mounting options
Cabling checklist.
Table I-1, "Tool, test equipment and accessories required" (p. I-3)
Figure 2-3, "Typical Alcatel-Lucent 1665 DMX high-capacity shelf
for Alcatel-Lucent 1665 DMX shelf placement
Planning
Alcatel-Lucent 1665 DMX R9.0
365-372-304R9.0 Issue 2
July 2010

Advertisement

Table of Contents
loading

Table of Contents