Nortel Contivity 600 Installing page 98

Hardware options for the contivity secure ip services gateway
Hide thumbs Also See for Contivity 600:
Table of Contents

Advertisement

98 Chapter 7 Contivity 4600 option installation
The Contivity 4600 supports a maximum of 16 I/O ports. This number includes
the built-in LAN port on the gateway. When you provision a Contivity 4600 with
I/O cards, do not exceed the 16-port maximum. For example, the following
configuration results in 17 I/O ports:
Built-in LAN port and installed 10/100 Ethernet LAN interface card (2 ports)
Three quad T1/E1 CSU/DSU WAN interface cards (12 ports)
One dual V.35 WAN interface card (2 ports)
One ISDN BRI S/T interface card (1 port)
To install or replace an interface card or a hardware encryption accelerator card:
1
Turn off the gateway and unplug both power cords from the power source.
2
Unscrew the four slotted thumb-screws securing the slide-out tray. Pull out the
tray by gripping it with the screws. It will only pull out halfway.
3
Remove the filler panel screw and pull out the slot filler panel.
4
Slide the option card into the intended slot. Make sure the card seats firmly
and evenly in the card slot. If the card is not seated properly, it will not work.
Populate the slots from slot 1 to slot 6 (top to bottom), in that order, as shown
in
Figure 42 Installing Contivity 4600 option cards
302283-K Rev 00
Figure
42.
CS460014A